That should be an hour long trip with 1-2 trains an hour
That should be an hour long trip with 1-2 trains an hour
I don’t see any non-stop airline flights between those cities for the smattering of dates I checked, suggesting that the airlines don’t find a lot of direct travel demand between that city pair.
As a reference, there are only 7 Acela trains per day (or at least on Monday 4/25) from Boston to New York, two cities with substantially higher population and apparent demand (as evidenced by the 59 non-stop flights from BOS to any of the NYC-3 airports on Monday 4/25)
We manage to do that between a town of 20,000 and a city of 1 million for comparison. Or if you feel commuter routes are different enough to not count, a city of 60,000 and a city of 1 million with similar travel time as google maps quotes me for Boston to New York.
And this is on the Northeast Acela, the crown jewel of the Amtrak network and between two cities with generally functioning public transit once you arrive. Most US city-pairs would be worse.
- There are about double that number of trains if you count the Regional (which you should) so ~hourly trains.
- A lot of people still fly. Especially if you live in Boston proper, flying means you can easily make a morning meeting without flying down the night before (which people with families etc. may prefer not to do)
- Especially if you're south/west of Boston or in New York's Connecticut suburbs, it's probably cheaper/faster to just drive, something I really try to avoid when it comes to NYC but nonetheless for me taking Amtrak actually involves me driving for an hour in the wrong direction/
The only way to get consistent usage is to commuter rail; commuters travel five times a day in both directions vs "travelers/vacationers" which may travel once a month or less.
The Northeast Corridor service is very popular. In fact, I believe Amtrak has plans to expand it given that it's pretty much the only place in the country Amtrak doesn't lose money.
A train every hour is convenient for some purposes, but for others you just want a bunch of trains early in the morning and later in the evening.
You also run into trainset issues where you want to run 5 trains in one direction and 5 back in the evening, which will require 5 trainsets, but if you run them back and forth you could do more trips with less trainsets, but some would be running off-peak (and in the worst case, nearly empty, but getting into position).
The second easiest is feeder - for example if the line between cities includes the airport, etc.
In my experience over the last few weeks there's barely been an empty seat.
I took the London-Paris train last week, absolutely rammed, there's 13x 900 seat trains a day at the moment, and that has all the nonsense of eurostar (airport style security, passport checks etc).
I don't think its popularity is a reasonable predictor of demand for a modern train that would be 3-4 times faster.
I'd wager if all the other competitors were also running with tech typical of the 1920's, the train would be more popular.
Fun fact: technically the boring large Pacific Surfliner trains could be "high speed rail" since they could get to 120 MPH through Camp Pendleton if the line had PTC and was signaled correctly. As it is hits 80-90 through there, but it soon has to slow down for a stop.
To do high-speed rail right you basically need four tracks - a slower local service that stops at every stop, and a faster high-speed express service that only stops rarely.
It made sense until Katrina destroyed a bunch of the infrastructure and Amtrak had to stop running. The fight is to restore service, not create a new service.
Oops, I missed that.
> Although I don't know what the pre-Katrina traffic looked like on that route
I don't know either. I didn't live in the area at the time, and I wasn't easily able to find any numbers.
> Though of course you're competing with a not terribly long drive.
Very true. I've driven part of it a number of times. I-10 can get bad with traffic in some areas at some times of the day, but I suspect the total driving time from New Orleans to Mobile to be around 2.5 hours normally. I'm certainly not authoritative, though.
It's a similar distance as Penzance-Exeter in the UK which has 22 trains in each direction on a weekday
We demand that public transit be self-sufficient, while subsidizing private personal transportation. The market is a great "figure out the most efficient solution" mechanism, but not if you skew it in favor of one particular solution as we're doing now.
https://www.businessinsider.com/history-of-amtrak-train-rail...
I'm certainly in favor of that, but my point is not "we should subsidize everything equally" so much as "pay attention to one-sided demands for self-sufficiency".
(To the extent that it's viable, I think "equal" subsidies would lead to a better outcome and uneven subsidues, since it would allow the market to sort out the most efficient way to meet people's desires, but I'm not sure that's even remotely possible.)
If only there were some other way to collect funds for roads. One idea could be that governments require some kind of annual "license" that they charge you for. Alternatively, since private automobiles involve a large capital purchase, maybe we could levy some kind of fee or tax on the purchase to cover annual road maintenance.
Most things do just look at parking and gas tax, but licensing fees are negligible compared to gas tax. The car sales tax might be a big source to make a difference, though. A few states don't have a sales tax on cars, but most do, and that may outstrip gas tax revenue if people buy frequently enough.
This idea that services shouldn't turn a profit is a massive problem.
Do city streets make a profit? How about sewers?
The value of those resources is immeasurable - they enable trillions of dollars of economic benefit in the US alone.
Instead of trying to nail on rail to cities it should be part of comprehensive travel planning that includes roads, etc. But selling it alone gets things like the California High Speed rail which hasn't sped anywhere, and dampens further similar projects.
Amtrak is a state owned enterprise. It is for profit, but it’s understood that it’s an economic multiplier.
The key with these kinds of service is you have to run them consistently for 10-20 years before they start seeing the kind of ridership that can support the train density. People don't start building their lives around a transport option that they can't rely on.
That's a good point. Whenever I've had the misfortune of using public transport in the US, it ended up being extremely unreliable.
Commuter bus at 6:30PM on a weekday? Just doesn't show up. Have to wait 40 minutes instead of 10.
NY to DC bus? Breaks down midway, have to wait an extra 2 hours for a relief bus to arrive.
DC to NY amtrak? Union station shut down for 3 hours due to weather-related power outage.
Now maybe I'm just super unlucky, but I've never heard of weather straight up shutting down an entire train station in other countries, especially in a nation's capital.
How about shutting down the entire network? Happens after any snowstorm in the NL.
That being said, it's amazing to have a reliable and fast passenger railroad network, which functions like an intercity metro and reliably and predictably brings you where you want to be in those 363 days out of 365 when there's no snowstorm, or a system failure, or a general strike.
But if a train, even a slower one, stopped in my smaller town or the next one over it becomes much more interesting.
So transit between cites doesn't work as well until the endpoints are adequately transited themselves (or your destination is something like an airport where you can't bring your car anyway).
Taking the train to NYC by contrast a car is, in general, actively a negative thing once you arrive.
https://www.southernrailcommission.org/new-orleans-to-mobile
> To initiate new daily passenger rail service between New Orleans and Mobile with two round trips each day, morning and evening, with stops in Bay St. Louis, Gulfport, Biloxi, and Pascagoula offering business-friendly service.
That is definitely not going to support trains that would have to average well over 140mph (there are 4 proposed stops between the 2 ends).