The DoD gives as an example a rate of 125%!
For DOT engineering design firms and environmental firms, a typical overhead rate is 165%-ish, I've seen ranges from 125% to 250%. Over 180% is considered "high".
For DOT engineering design firms and environmental firms, a typical overhead rate is 165%-ish, I've seen ranges from 125% to 250%. Over 180% is considered "high".
No comments yet.