There is no information: on state, maintenance, geologic activity, or initial failure point.
While interesting any claim of cause is at absolute best an “educated guess”.
There is no information: on state, maintenance, geologic activity, or initial failure point.
While interesting any claim of cause is at absolute best an “educated guess”.
There are parts of bridges where any failure would be expected to cause complete collapse, like the cracked beam on the Hernando de Soto bridge (happily that span turned out to not actually be critical). But as the Hernando de Soto bridge showed you can have a complete failure of a major structural element without a collapse (in this case we’re lucky that accidentally happened).
So if the report says that none of the instant fail section were responsible I’m going to trust that.
You cant squeeze blood from a stone.
We know what that "fracture critical" components of a structure through analysis of the design. So what the NTSB is saying here is that none of the components of this bridge that were identified as being fracture critical are the cause of failure.
Of course that doesn't mean there wasn't a single component failure, it is possible that there was an error in the analysis and a fracture critical component was not identified. Alternatively an error in construction could result in weaknesses in the structure leading to more fracture critical components.