The bridge suffered a fatal compromise but stood with light traffic. Until some combination of speed and weight of the bus pushed it over the edge. Something happened in the minutes or hours before the collapse and it was doomed to fall.
The bridge suffered a fatal compromise but stood with light traffic. Until some combination of speed and weight of the bus pushed it over the edge. Something happened in the minutes or hours before the collapse and it was doomed to fall.
I'm really curious what could have happened to cause it to collapse so catastrophically when it withstood far more traffic just ~12 hours earlier.
Maybe the bus wasn't supposed to cross that bridge?
The bridge was 136m long, by about 13m wide and assuming 2.5cm of water content:
136m * 13m * .025m = 44 m^3 of water, or 44,000 kg, roughly 50 US tons.
A newspaper report said there was a light snow with 1 or 2 inches accumulated since 2am the morning of the collapse. Photos of the scene showed grass and small rocks on the ground visible through the snow, so it doesn't seem like there was a lot of snow on the ground. Even if there was heavy snow a couple days before the collapse, most of it would have been plowed off, I don't see big berms of snow on pictures of the collapse.
So if there was just a couple inches of snow, then it was probably closer to 10 tons worth of snow.
https://www.cnn.com/2022/01/28/us/pittsburgh-bridge-collapse...
10 lb/ft * 450ft * 45ft / 2000 = ~100 tons
If prior NTSB reports are any predictor, we'll eventually learn all about the confluence of things that led to the collapse.
Perhaps a freeze thaw cycle that split one to many bolts?