The $1.5B Mammoth Solar Farm Will Be the Largest in the US
interestingengineering.com
interestingengineering.com
The total power is going to be 1.65 GW, and the total cost $1.5 BN. That would be about $0.9 BN per GW.
Meanwhile Vogtle 3 and 4 will make about 2.3 GW together for a total cost of $25 BN, so a bit more than $11 BN per GW, or about 12 times more.
But that's not quite apples to apples. Solar power has an average capacity factor of about 30%, while nuclear about 90%.
What is then the cost of 1000 GWh annual net output? I picked out 4 more or less random large solar farms in the US from wikipedia [1] (Solar Star, Mount Signal, Springbok and Copper Mountain) and on average a 1 GW (DC current) farm produces about 1800 GWh annual net output. Assuming this new farm is similar to those other 4 large solar farms (which are all fairly new, commissioned between 2015 and 2020), then the cost of 1000 GWh is about $0.5 BN.
Meanwhile, Vogtle 3&4 have about 19000 GWh annual net output, for a nominal power of 2.3 GW, so if we scale to 1 GW, we get about 8.2 GWh per year. We get a cost of about $1.3 BN for 1000 GWh annual net output.
So each GWh produced by a modern solar farm is about 2.6 times cheaper than a GWh produced by an equally modern nuclear power plant.
Can nuclear become cheaper? NuScale claims to be able to deliver nuclear power plants at a cost of about $2.85 BN per GW [2], which is 3.8 times cheaper than Vogtle 3&4. If they are able to deliver, then they should be quite cost competitive with modern solar.
[1] https://en.wikipedia.org/wiki/List_of_photovoltaic_power_sta...
Vogtle 3&4 are American plants. I don't follow the news there closely. The last I read was that the long-term storage facility at Yucca Mountain was cancelled. No no replacement or alternative in the reports I read. Did I miss anything? Has a plan for how to store the waste been formulated, perhaps even a cost estimated? How are insurance costs to cover liability costs in case of accident estimated?
Insurance: currently nuclear power plants are obligated by law to buy insurance. The current scheme covers liabilities up to $13 BN [3].
[1] https://en.wikipedia.org/wiki/Nuclear_Waste_Policy_Act#Nucle...
[2] https://www.wsj.com/articles/escape-from-yucca-mountain-bide...
[3] https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/n...
this annoys me.. unless by some 1/1000 chance the thing's area is an exact multiple of 1,000 acres, the first number is rounded to the nearest 1000 acres. If the first number is rounded, the second number should be rounded to the nearest ~500 hectares.*
Otherwise you could do something especially silly like saying '13 000 acres (52 609 180 square metres)'
* I'm not exactly sure what the protocol is for rounding between different systems - since 1000 acres is ~404 hectares, I'm not sure that 500 would be the correct rounding value to use for hectares)
i don't see the price of batteries decreasing to such an extend that it's cheaper to solar capture and store with batteries (of the lithium-ion kind at least), than to produce electricity with nuclear.
And i would say we need a mix of everything, since they all make different trade offs.
These things don't involve much new traffic to/from, don't pollute, hardly obstruct anyone's field of view, but may involve felling trees etc and building power lines. Environmental study rules are of the form "if x then study type y is required", and these have few xs but not none.
I don't know why putting them all in one place like that is preferable to decentralization.