Typical contender teams spend $300m/year.
https://www.gov.uk/government/statistical-data-sets/gas-and-...
It looks like 14-17 cents per kilowatt hour is about the going rate as of Q3 - Q4 2020.
I’m a little surprised this doesn’t lead to more such facilities being strategically located based on availability of cheap power, e.g. by building near to hydro, and where power costs can be ~2c/kWh. See: https://www.seattletimes.com/business/technology/sunday-buzz...
I’m forced to conclude the power costs are a marginal expenditure versus other costs involved in running such a facility, and benefits from having R&D, testing and validation, and production all on the same campus?
Check out this 8 part YouTube series from Sauber about their wind tunnel installation: https://www.youtube.com/watch?v=RBVgwpYUp18
These are big industrial installations which need highly specialized staff to run them. Even if the facility exists, keeping the "wind on" costs a lot of money per hour.
Ironically, as a response to the newly introduced cost cap measure, the teams are building new facilities like crazy right now, with many teams building a bigger wind tunnel so they can have it in the books before the accounting for the cost cap starts.
[0] https://en.wikipedia.org/wiki/McLaren_Technology_Centre [1] https://www.youtube.com/watch?v=RBVgwpYUp18