Even if you could somehow launch one every minute that would still take 2 weeks of non-stop bombardment.
Fascinating how much stuff you can put on a ship and the scale of loading/unloading operation.
Even if you could somehow launch one every minute that would still take 2 weeks of non-stop bombardment.
Fascinating how much stuff you can put on a ship and the scale of loading/unloading operation.
Nope 300k appr ! https://kubernetes.io/docs/setup/best-practices/cluster-larg...
Edit: It may also not be "full". Here's a top/bottom picture with the most "full" I could find on the top, and the current situation on the bottom. https://imgur.com/a/b8neNkR
Edit: So maybe 6000 40 foot containers, current state?
Then a week of bombardment. Still impressive.
And a good photo to confirm your 28 bow-to-stern number: https://photos.fleetmon.com/vessels/ever-given_9811000_26410...
Usually the crane operator will load/unload several containers without moving along the dock; because they're all lined up, the crane only needs to travel in two dimensions (vertically and across the boat from port to starboard). The cranes are specialized to pick up containers by the top corners, which makes connecting fast. Standardized containers means the corners are at the same place (ok, there's a few sizes, but 40 ft containers are the vast majority of ocean shipping) and lining up is easy. On the dockside, there's a crew of longshoremen that move chassis (trailers) into place for the crane to drop (gently, usually) the containers on, those are then parked nearby, etc.
Depending on the ship (and the dockside staffing), you can have multiple cranes working the ship. Planning is required to keep the ship balanced and minimize the number of containers moved. These ships generally visit several ports in order, and usually both unload and load at all of them, so it's complex.
Depending on the traffic (and pandemics), the port runs up to three shifts.