Underwater Roundabout in the Faroe Islands
bbc.com
bbc.com
It turns out that it's connecting 3 different places - there's a map on this article that helps to clarify it: https://www.estunlar.fo/en/about-the-tunnels/the-eysturoy-tu...
[n.b. I am assuming the plan actually makes sense, and that when you compare the three-headed tunnel, the two tunnels, and the tunnel & bridge solutions, and all of the maintenance and externalities of roads connecting them, the three-headed tunnel is no more expensive, and trying to think of reasons this may be. If the plan is actually more expensive, or if no counter-proposals were considered, this is all somewhat moot.]
Here it is in GMaps: https://goo.gl/maps/ijR9TG3LbyKo3wW7A
Note that the map in the parent seems to be rotated.
It’s not totally clear why this is the case. But for some reason building infrastructure in the US is substantially more expensive than anywhere else in the world. Even when controlling for the quality of that infrastructure.
So if you are American, then your intuitive costs for these tunnels might be way off their actual cost.
[1] https://tunnelingonline.com/why-tunnels-in-the-us-cost-much-...
Also consider this:
> On the Eysturoy side of the tunnel house prices increased by 31% between 2019 and 2020 and have doubled between 2015-2020 [0]
Additionally, the tunnels are tolled [0]:
> Construction costs for the tunnel are being recouped through toll fees. Tolls start at 75 DKK for small cars (up to 3,500 kilograms (7,700 lb)) between Tórshavn and Eysturoy, and 25 DKK for local traffic between Saltnes (near Runavík) and Strendur. This price is for people who have a subscription (hald). Without subscription the price is 175 DKK between Eysturoy to Streymoy and 125 DKK between the two arms of Skálafjørður.
75 DKK are around 10 EUR. With an estimated 6,000 cars per day, thats 60,000 EUR per day. At this rate, the tunnel will have paid for itself (if maintenance cost is excluded) after 8 years.
17M/km - that is the key. It is couple orders of magnitude cheaper than in some other places. Or compare to just road, not tunnel, building:
https://www.rbth.com/articles/2010/10/20/what_drives_russias....
"However, the Russian costs of road building are among the highest in Europe, with each mile of road costing $10.5 million."
and the 20km Crimean Bridge cost almost $4B. If they tried tunnel instead of bridge, i suppose that would have added another order of magnitude :)
This is somewhere in between I think.
Those tunnels cut travel time to the capital from 1h14 to 16 min. Moreover, you don't have to travel by car+ferry+car, you simply drive.
I reckon the increased accessibility makes it worth them in one year.
If you only want to count in monetary terms, consider that a hospital in the capital is suddenly reachable in 16 min instead of over 1hr. So they don't need helicopters for emergencies; they don't need minor, unsustainable hospitals on the other island just to have healthcare accessible, etc. Same for other things: supplying the 2nd islands can be done by lorry from the first, instead of shipping. Et cetera, et cetera, et cetera.
Cutting that drive to 15m seems like it's worth it, especially given the weather there. It's probably a huge increase in safety and reliability too.
You would probably have a similar experience in the Lærdal tunnel. https://en.wikipedia.org/wiki/L%C3%A6rdal_Tunnel
To counter this, the tunnel is broken up somewhat by three caves blasted out at regular intervals; these are lit by coloured lights and go a ways towards breaking the monotony.
Still mind-numbingly boring, though.
To give an idea of how prevalent tunnels are in western Norway - going from where I live in Hareid down to where my mother's family comes from, Voss - a 400km/250mi drive - just over 100km/62mi are in tunnels, including the Lærdal tunnel and the Eiksund tunnel, which was until recently the deepest subsea road tunnel in the world at 290m/950ft deep. (Steepest grade: 9.6%. Engine braking is your friend.)
Don't remember exactly, but I think the first part is uphill, then flat, then downhill. You can see it very clearly on the performance monitor. There's also the built-in curves, of course, but I guess that's pretty standard road tunnel engineering.
Cement rendering is the application of a pre-mixed layer of concrete, possibly colored, onto a surface. Per the wikipedia link.
Render images can be found here: https://www.estunlar.fo/fo/um-tunlarnar/eysturoyartunnilin/
But, I'm curious how fresh air is pumped into the tunnels?
I'm guessing that there might be some sort of mechanism for this?
Maybe pressurized air pipes and/or ducts/fans at regular intervals, and/or some other form of ventilation system?
Observation: For future underground tunnel systems, if only electric vehicles are permitted to enter, then there might not be as hard a requirement for an apropriate ventilation system as there would be for fossil-fuel vehicles...
I don't think much forced ventilation is needed for normal operation - the blades spin very leisurely, if at all - but in case of fire they can direct the smoke and heat away from the bulk of the people trapped inside.
The fans look like good ol' jet engines.[0]
[0] https://www.systemair.com/fileadmin/_processed_/c/7/csm_Syst...