This however is aimed to explore novel geometries which may aid in future designs. However, the net efficiency at this scale would be vastly lower. It’s still a useful project, but it’s just one of many possible designs.
This however is aimed to explore novel geometries which may aid in future designs. However, the net efficiency at this scale would be vastly lower. It’s still a useful project, but it’s just one of many possible designs.
See these links for more: Question asked in the EU parliament: https://www.europarl.europa.eu/doceo/document/E-8-2018-00081...
https://news.newenergytimes.net/2020/11/03/open-letter-to-it...
For 50 MW of injected heating power it will produce 500 MW of fusion power for long pulses of 400 to 600 seconds. https://www.iter.org/sci/Goals. To be more clear, injected heating power excludes the energy required to get to a steady state, as otherwise pulse length needs to be factored in.
That said ITER is running a lot of equipment unnecessary for a commercial power plant making engendering Q factors misleading. For example a power plant would not need to collect, process, and store the vast amount of scientific data that’s the point of the experiment. It’s really better if their not turning the rooms lights off trying to hit some arbitrary target.
PS: It was posted ~3AM and I am still out of it. So, I am kind of surprised how coherent that was even though I mess up conveying some heat was from electricity where the other heat was from fusion.
After the first reactor, do we expect building a replica, without all the R&D costs would be significantly more expensive than a standard nuclear reactor?
To me, 10x the energy sounds really good.
https://www.iter.org/sci/MakingitWork
"The neutrons will be absorbed by the surrounding walls of the tokamak, where their kinetic energy will be transferred to the walls as heat. In ITER, this heat will be captured by cooling water circulating in the vessel walls and eventually dispersed through cooling towers. In the type of fusion power plant envisaged for the second half of this century, the heat will be used to produce steam and—by way of turbines and alternators—electricity."
A "real" reactor will need to have tritium breeding blankets to regenerate the tritium. Otherwise, the cost of tritium alone, if made in fission reactors, for a 1 GW(e) DT fusion reactor would be $15B/year.
For this reason, a Fusion Nuclear Science Facility has long been proposed as something that will be needed before DEMO is built. This could be a small, Q < 1 DT fusion device, as the goal would not be plasma physics related. It itself will need to breed its own tritium to operate long enough, so there's a circular dependency in the development.
Unfortunately the budget for ITER comes out of the US science budget instead of the State Department. Most US fusion funding only goes to ITER at this point.