Being able to move the bulk of building an offshore turbine into a factory could lead to amazing economies of scale. It'll be an incredible assembly line to pull together 10,000 ton of materials but if we need to build hundreds of thousands it might well be worth doing. There should be a gentle stream of these things bobbing out into the sea, ready to be taken by tug to their resting place.