This is absurd. Intel’s fab capacity is several times TSMC’s so even if intel had chosen to do this there is no way TSMC would be able to satisfy Intel’s needs. In addition most of TSMC’s capacity has already been committed.
That’s the business side; ignore the technical errors like 3 nm.
There’s already a comment saying this is market manipulation; I just wanted to point out the logical fallacy to avoid “is no” — “is so”.