I imagine this could result in a feedback loop between the power plants scheduling and your devices scheduling if enough people use it.
If the load responding to increased renewable generation exceeded the generation then the excess load should have just run whenever it was convenient since it isn’t using renewable power anyway.
I’ve omitted nuclear and large hydro from my discussion even though their fuel doesn’t emit carbon.