These types of fusion projects are trying to prove the most basic piece of the puzzle: net energy generation. And it is a big problem, even for Commonwealth. I've heard that the magnets are underperforming by about a factor of 2 - and that's 4 years into the project.
But commercialization is a lot more than just proving that the concept is physically possible. It was proven possible that man could walk on the moon, but it's not a commercial activity 50 years in. Commercialization for nuclear energy systems means global deployment, mass manufacturing, lack of proliferation risk, extreme safety, etc. Fusion systems like Commonwealth's do not meet any of these criteria. They are constantly generating radioactive waste because they have to breed their fuel and reprocess it on site.
To commercialize, you have to be able to deploy the technology in a significantly better way than traditional fission. These large fusion prototypes ($65B for ITER and $5B for Commonwealth based on their 2015 white paper, so probably 2-4x larger now) exacerbate traditional nuclear's cost problems because they are construction projects that will last decades. Viable nuclear solutions will be factory manufactured rather than constructed.
For comments from MIT dissenter in 80s that stand true today: http://orcutt.net/weblog/wp-content/uploads/2015/08/The-Trou...
For a review of fusion problems: https://thebulletin.org/2018/02/iter-is-a-showcase-for-the-d...