you need to be addressing the larger chunks of these pie charts:
In fact, there are apartments here in Amsterdam that stay a cool 20C in winter with little or no heating at all, just the warmth from the water boiler flue running through the heat exchanger of the air ventilator.
Nationally sponsored infrastructure plans to replace existing buildings with energy class A at scale would put a big dent on energy consumption.
EDIT: "20 years from now" is still faster than any nuclear generator getting built.
All options are trade offs, and I don't understand why "perfect" keeps preventing us from just getting "better".
That it takes so long now in the west is because we're not building enough of them, thus losing the advantage of experienced workforces and inability to leverage mass-manufacturing of standardized designs.
It's also slow because of onerous safety regulation seeking to make nuclear too safe, when we consider the result of a slowdown in commissioning of new reactors, thus increasing the reliance on coal killing way more people than if we were to hypothetically mass manufacture relatively unsafe reactor designs from the 60s today.
"The country [China] has the capacity to build 10 to 12 nuclear reactors a year. But though reactors begun several years ago are still coming online, the industry has not broken ground on a new plant in China since late 2016, according to a recent World Nuclear Industry Status Report.
Officially China still sees nuclear power as a must-have. But unofficially, the technology is on a death watch. Experts, including some with links to the government, see China’s nuclear sector succumbing to the same problems affecting the West: the technology is too expensive, and the public doesn’t want it."
https://www.technologyreview.com/s/612564/chinas-losing-its-... (China’s losing its taste for nuclear power. That’s bad news.)
> That it takes so long now in the west is because we're not building enough of them, thus losing the advantage of experienced workforces and inability to leverage mass-manufacturing of standardized designs.
Can you provide evidence that the cost of nuclear would be comparable to solar and wind if built at scale?
> It's also slow because of onerous safety regulation seeking to make nuclear too safe, when we consider the result of a slowdown in commissioning of new reactors, thus increasing the reliance on coal killing way more people than if we were to hypothetically mass manufacture relatively unsafe reactor designs from the 60s today.
I'm unsure you can sell nuclear to the public or politicians as "it's expensive because it's too safe". It's unlikely we're going to relax safety regulations when cheaper alternatives already exist (solar, wind, natural gas, storage). We're not increasing our reliance on coal, we're temporarily increasing our reliance on natural gas (which is driving coal and nuclear out of business).
EDIT:
"but pointed out that it taking anywhere near 20 years to build a nuclear power plant is clearly off by an order of 4x at the very least."
I’d prefer nuclear reactors not be built in the developed world to Chinese standards.