I’ve heard on the grapevine that facilities are now being designed which work at under 100% capacity in order to soak up excess/cheap power.
I believe this is coming about because: 1) the high cost of power and presence of sporadically cheap power makes it economically viable, and 2) designing equipment with lower duty cycles can actually provide substantial cost savings. Ie a facility which only runs 50% of the time is much cheaper to build & run than once which runs 100% of the time.
Sorry I cannot cite sources right now.