Also, 2/3 of their gas pipelines were built before 1970
> A Chronicle investigation pointed out in October that two-thirds of PG&E's pipelines were built before 1970. That was a key year, in which regulations requiring better welding techniques were enacted.
> Also, the vast majority of PG&E's old pipelines can't be inspected with the most modern technique - a device called a smart pig, which is bristling with sensors and is run through the interior of a pipe. PG&E has also been unable to find complete documentation confirming the safety of maximum pressure levels for about one-fourth of its transmission pipelines in and around urban areas. [2]
Per the pdf [3], page 18, PG&E spent $834m capex and $4.9m opex over 4 years replacing 186 mi of pipeline. This averages out to $4.4m/mi, and much of it doesn't seem to have been in urban areas, which massively increases expense and public disapproval. So you can see the magnitude of the cost to replace the (2/3) of 6700 mi of pipeline built before 1970. Roughly (2/3) x 6700 x 4.4e6 = $19.6B.
None of this means PG&E is spectacularly well run. But the $100m they apparently were supposed to spend on pipe replacements is barely a drop in the bucket of doing a system-wide pipe replacement that we perhaps ought to be doing.
[1] https://www.pge.com/en_US/safety/how-the-system-works/natura...
[2] https://www.sfgate.com/news/article/PG-E-under-spent-on-pipe...
[3] http://www.cpuc.ca.gov/WorkArea/DownloadAsset.aspx?id=4594