Cost breakdown for Solar PV with lithium-ion storage
pv-magazine-usa.com
pv-magazine-usa.com
In the South West US, this reaches 30% capacity BEFORE any storage.
Add 4hr storage and we reach 50% capacity. This is true for about 50% (pure guess) of humanity that lives in sunny climates.
Even better, poorer/populous countries are often closer to the equator with even better solar conditions.
We are literally half-way to solving our climate problems.
Now, about those Windows updates...
That is counter to anything I've ever read on the subject. Can you source your claim?
For example, here's the demand curve for California's CAISO today:
http://www.caiso.com/TodaysOutlook/Pages/default.aspx
The peak demand is between 6 and 7 PM. Since the sun sets at 4:55 PM today in Los Angeles, and solar output dips significantly starting a couple of hours before sunset, solar cannot supply any of the peak-demand load at this time of year. Even with later sunsets in the summer, solar can supply only a fraction of peak-period demand. But solar coupled with 4 hours of storage can cover the most important hours just before and just after sunset. By the later evening, demand is lower and wind output has often increased.
The two most interesting cases:
Standalone 100-MW PV system with one-axis tracking ($111 million) -- this is a pretty typical configuration for a new solar farm being built today.
Co-located, AC-coupled PV (100 MW) plus storage (60 MW/240 MWh, 4-hour duration) system ($188 million) -- this is a battery system plus the solar farm at the same facility. AC coupling is a little bit more expensive than DC coupling but it is more flexible; it can be installed as part of the original solar project or as a retrofit. Most utility scale PV projects that are already built have ample room for a battery system on the same site.
A year ago, XCel Energy in Colorado received median bids of $36/MWh ($0.036/kWh) for PV plus 4 hours of storage:
https://www.greentechmedia.com/articles/read/record-low-sola...
However, those bids are for projects to be completed in 2023 and NREL's cost estimates are for projects built now. That can explain part of why NREL's cost premium for adding storage appears to be higher than the premium assigned in recent auctions.
The interactions are complex enough I think production, transmission, and storage all need to be dealt with separately.
The proposed Grain Belt Express transmission project goes through only 3 states and received its first approval (in Kansas) 7 years ago. It is still trying to get the necessary approvals in Missouri. Due to this drawn-out process in Missouri, opponents in Illinois were able to reverse the project's earlier-obtained Certificate of Public Convenience and Necessity. Even if Missouri gets on board the project will have to re-obtain approval in Illinois, and perhaps by the time that's over Kansans will have new objections.
The Pacific DC Intertie is not nearly as long as a connection between CA and FL would be. In that scenario, transmission losses would be quite significant. The cost of building and maintaining the line would also be quite high.
https://www.energy.ca.gov/almanac/electricity_data/total_sys...
That's summing up nuclear, large hydro, and renewables excluding biomass from the California Power Mix column.
Still seems very low to me. I'm looking at my own 2x powerwall estimate (24 kWh), and it's $450/kWh after all rebates and credits. Maybe they're averaging some state rebate in this methodology.
“The 19.4 cents per kWh New York households paid for electricity in November 2018 was 45 percent more than the national average of 13.4 cents per kWh” [1]. The four-hour duration system thus costs over 280,000% more than the baseline. How do those numbers make sense?
[1] https://www.bls.gov/regions/new-york-new-jersey/news-release...
Yup–thank you!
" Xcel Energy in Colorado saw bids for solar-plus storage at $36 per megawatt-hour, compared to $25 per megawatt-hour for standalone solar, and NV Energy has seen even lower bids in its solar and solar-plus-storage RFPs.
That equates to about a $6 to $7 per megawatt-hour premium for solar projects that are partially dispatchable — if not completely dispatchable in the manner of a power plant. By 2023, when the ITC window closes, the levelized cost of energy (LCOE) of combined solar-storage projects will put them in direct competition with traditional generators, Manghani said."
https://www.greentechmedia.com/articles/read/five-prediction...