https://s.aolcdn.com/hss/storage/midas/984273818587a1353cda1...
I'm not saying it's not new... but it doesn't _look_ new.
https://s.aolcdn.com/hss/storage/midas/984273818587a1353cda1...
I'm not saying it's not new... but it doesn't _look_ new.
You know, like most Canadian buildings.
(Here in Vancouver, I see plenty of stick-built buildings left half-constructed due to developer or zoning problems, with their frames and plywood panelling just left exposed to the elements for months; and then construction resumes and the building has sheeting and cladding and insulation slapped on over just a few days. I've always wondered whether that traps in the moisture that's accumulated in the wood over the previous months, leading to those buildings having mould problems later on...)
Not sure where you got that idea from, but as a structural engineer in Vancouver I generally see the exact opposite. Once construction starts, it's an all out scramble to finish as quickly as possible.
Also, zoning problems occur at the building permit stage, which is well before construction starts.
I’ve always assumed it was a result of either the development company or their general contractor going out of business / running out of budget before completion; and that, when construction resumes, it’s because the site has been liquidated and sold at auction to a new developer.
Other times, buildings (usually commercial) are left 90% finished for years at a time—clad and insulated, but not wired or finished inside. I assume this these buildings are actually as finished as they’re going to get, and are for sale, waiting for an initial owner to decide how they want to finish them (instead of having to rip out and redo the previous interior and exterior), and they just aren’t being publically advertised. They still look kind of like blighted abandoned buildings, though, and kind of destroy the character of a neighbourhood in a similar way to the half-built homes.
You also don't pay as much taxes when sold not finished.
When my wife volunteered there right before the earthquake she said that many structures had exposed rebar sticking out of the concrete. She thinks that increases the fatalities significantly.
Also the remnants of the war had a much bigger impact on my memories of the country: we saw a few buildings still covered with bullet holes and areas cut off because of mines. That nearly two decades after the war such things were still visible was an interesting experience.
Wrong choice of words here, I was trying to say "bigger impact"
Down in Orlando (actually Altamonte, but if you're not from Central Fla, it's Orlando), there's a building a local mega-church has been "constructing" since 2001. They wanted to build it with no financing, and kept putting construction on hold every time they ran out of funds. Pretty sure at this point they've spent more in property taxes for a building they can't use than they would have spent in interest if they'd just financed it from the start, but, shrug.
It's a pretty ugly building design to begin with, too. All those mirrored windows are blinding when the sun hits them the right way.
As for building codes, I'm not sure. I just moved back down to central Fl after living in Gainesville the past 20 years. I do know that 30 years of living in Florida has taught me to never buy a mobile home. Hurricanes flatten those. I feel bad for the folks that don't have the ability to afford something more sturdy.
There's a lot of new construction in the next neighborhood over from mine (old golf course turned housing development), but I'm not sure if they're stick-frame houses or concrete. It's also an upscale development, not lower-middle-class.
Commercial units are left that way even for leasing, because the tenant will come and finish it to their specifications (once a tenant is found).
For these large projects, I've noticed something else that I've been curious about: condo projects that sit as empty lots with "coming soon" banners around them, for years at a time before they begin construction.
What's up with that? My first guess: by the time the developer gets zoning approval, the contractor they've retained has taken other work, and now they're waiting in line.
I figure the other developers keep running out of money. To be fair, developers of the completed building, Leddingham-McAllister paid people to come from China to buy units. I spoke to a few of them one day when I seen them lined up down the road.
The company paid for their airfare and hotels so they could come purchase suites in their apartment complex. This was before construction actually started. I never seen any lineups of paid foreign buyers at the other one.
On another note, all the developments that have been completed in the almost ten years i've lived where I do, have remained at least half empty. Most of the suites have never had lights on orbeven curtains put up since they've been built. No ones ever lived in a good majority of the empty suites around me.
And at least one group of them are used for prostitution. I regularly see ads posted nearby offering girls $2000 a week and such to live and work in the buildings.
> The Saskatchewan Association of Rural Municipalities inspected the bridge earlier this year and told the RM that it would need to be replaced as it was rotting and dangerous.
> The municipality put out a tender and selected Can-Struct, who had been working on the project for the last four or five weeks.
Shame they fell off when the blue metal pier sank.
[1] http://www.michiecorp.com/wp-content/uploads/2014/06/beams-c...
On the far pier, the diagonal braces are a meter above the water, while on the near pier they're 20cm below the water.
My bet is when it was constructed the two piers were at the same height, and the center span was supported on both ends - then the near pier sank, allowing the center span to slip off.