I learned this during a summer job in college at the research labs for a large gas pipeline company in the early 70's. At the time a "pig" was used to provide the x-rays for checking the welds of under-sea gas pipelines while they were being constructed. This pig was a remotely controlled wheeled device that moved from weld to weld and x-ray film would be put on the outside of the steel pipe for exposure. The pipe segments were welded together on a barge that floated in perhaps the Gulf of Mexico. Because the welding took several separate passes around the pipe it was done in a continuous operation with the pig x-ray as the final stage before the pipe slid off the back of the barge into the sea.
Normally, the pig motored toward the open, working end, of the pipe as new sections where being assembled on the barge. Once, the pig malfunctioned and took off in the wrong direction; it rolled down to the sea-floor. A guy from the pig company had to be flown to the gulf. He was rolled down the pipe lying on something like a skateboard (attached to a rope) to retrieve the pig!!!
The french plant (in Flamanville, Normandy) has a number of faulty parts, including the cover of the pressure chamber.
Latest article in english I could find is this http://www.world-nuclear-news.org/RS-Flamanville-EPR-weld-ch... but since, several other defects have been found.
EDF is currently lobbying for an OK from the nuclear safety regulator despite the faulty welds. Earlier this week I read that the deal would be something like a reduced lifespan for the cover with yearly inspections. Some even said that the alternative is basically to torn apart the power plant, remove all the machinery, redo it, re-deliver it and pray for quality welds this time.
The chinese ones are about 1 year behind schedule. The english one (Hinkley Point) is 15 months behind schedules, also because of quality issues. The finnish one (Olkiluoto) is almost ten years behind schedule. The french one (Flamanville) is 8 years behind schedule.
In most cases, EDF is liable for damages because of the large delays.