Usually city inspectors don't know enough to evaluate those kinds of things.
Which is why they require engineering signoff for things they can't evaluate themselves. Try to replace a beam in your basement to create a longer span and the building inspector isn't going to do load/span calculations himself, the building department is going to require a PE to sign off on the design.