Florida bridge collapse shows how Accelerated Bridge Construction can go wrong
slate.com
slate.com
>If a design flaw was responsible, it would be a relatively rare failure of a highly reliable technology. The FIU bridge was to have been cable-stayed, a technology that has been around since at least the 16th century.
I have no evidence that the cause wasn't accelerated bridge construction. But it would be a shame for a promising new technology/philosophy with obvious benefits to become a casualty of this tragedy simply because some commentators couldn't resist rubbing salt in FIU's wound for the irony vaue. It's irresponsible and downright unethical for Slate to publish that claim on pure conjecture.
[0] https://www.usatoday.com/story/news/2018/03/16/miami-bridge-...
There is no indication that ACB contributed to this collapse, rather, this was a faulty design that would have also posed a risk using traditional construction techniques.
The author is a history professor, not an engineer, and it shows with the faffery about metonyms of ecological development in South Florida near the end. If the issue here was with the ABC methodology (as opposed to a misapplication of it), we'll soon learn, but I doubt it. In the mean time, the only person who stands to gain from this FUD is the author.
I had to read that a few times. Is that really what happened. So this is a design where the load is held mostly by the tower(s) and they just laid the bridge down first without the tower and were going to add the tower later.
In her study of the Challenger Space Shuttle disaster, the
sociologist Diane Vaughan noted a phenomenon she called the
normalization of deviance, an acceptance of assumptions and
shortcuts that over time incrementally piles on risk until,
like compounding interest on debt, a kind of technological
bill suddenly becomes due.
"Normalization of deviance" is such an amazing turn of phrase to express what it feels like to be involved in accumulating tech debt.