I'd imagine that the lead time on getting the substation equipment is probably the longest for all of equipment inside a DC. Chillers, UPSs, generators, and breakers are probably not in as high demand or take as long to manufacture as a MV XFMR.
Why not shorten the lead time by biding higher for freshly built XFMRs from other countries of the desired capacity?