How to Get Wyoming Wind to California, and Cut 80% of U.S. Carbon Emissions
technologyreview.com
technologyreview.com
Geologists have rough estimates for how much sediment, from the once 10,000 - 15,000 foot higher Rocky Mountains, has been deposited in the plains and in the Mississippi river delta. It's a lot! So much that the delta has 25 thousand feet of sediment, sinking and pressing down into the Earth's mantle, causing one heck of a thermal reaction.
But maybe 30% of the former Rocky Mountains is unaccountable as sediment or as nicely sloped Kansas/Nebraska plains. One day, scientists in South Carolina noticed a lot of dust in the air. They checked the weather and found out the dust had been carried from the Rockies. They estimated that over 1,000,000 tons of dust was deposited in the Atlantic Ocean that day.
Apparently, many places in Wyoming don't have any soil smaller than pebbles. It's all been blown away.
Wyoming has a history of producing energy for the West Coast. The Jim Bridger Power Plant is turing 250 tons of WY coal per hour into 2,000 MW of electricity for the Pacific Coast. But, it's keeping all the pollution for Wyoming.
You can learn a hundred more interesting facts, in poetic story form, by reading: Annals of the Former World by John McPhee.
https://www.amazon.com/dp/B005H0O8KQ/ref=dp-kindle-redirect?...
How, with all that wind, is the pollution staying in WY?
1. https://en.wikipedia.org/wiki/High-voltage_direct_current
2. https://www.siemens.com/press/pool/de/events/2012/energy/201...
The Intermountain Power Plant HDVC line begins at the Intermountain Power Plant, a coal-fired plant in Delta owned in large part by Southern California cities, and runs to Adelando, CA, on the outskirts of Victorville. It can already rapidly dump power between west-central Utah and southern California. With coal prices remaining high relative to natgas and California pushing for more renewables, the future of the Intermountain Power Plant is in question. It seems shortsighted then, to not plan an interconnection at Delta from the start.
Redundancy and resiliency is another issue. Most of the transmission lines between the Las Vegas Valley and Mesquite, NV closely parallel each other, the Union Pacific railroad, and I-15. One major disruption to a small area could easily cripple a significant portion of southern California's power capacity (including power lines [3] to Glen Canyon Dam, Navajo Power Station, and the coal plans around Farmington, NM), and cut off a critical transportation route with the interior. The patchwork of public land, protected land, and military reservations in southern Nevada complicates the placement of infrastructure, and confines it to narrow corridors, but piling further projects immediately adjacent is a risk.
[1] http://www.transwestexpress.net/about/docs/TransWest-Express... [2] https://www.openstreetmap.org/relation/3392214#map=7/37.130/... [3] https://www.openstreetmap.org/way/14282204
If your goal is just to connect the grid you’d only need to connect Wyoming to Salt Lake and maybe upgrade Path 27.
[Ironically, the EPA was harassing gas companies in Kansas about drilling rigs disrupting the breeding habits of the greater prairie chicken. Not sure if the same happened to the wind companies]
I'm happy to see renewables, but they are coming at a cost.
Climate change.
Or did we cut down all the trees and dig up all the grass that was preventing the soil from blowing away?
One thing that I do appreciate is that most wind energy installations bury their cables. It's only a few percent more expensive than poles, but looks so much better and has fewer maintenance needs. It's a tragedy of economics that we as a society have selected elevated transmission lines.
driving across Spain I found the wind turbines a pleasant part of the landscape
Don Quixote, not so much.http://articles.latimes.com/1987-04-23/news/mn-722_1_eiffel-...
This is a fairly minor issue that the planners are usually required to mitigate as much as possible, and the non-renewable sources have a significant cost to bird habitats as well. The various bird protection societies are usually cautiously in favour of wind power provided it's not in a sensitive habitat.
It turns out that glass-windowed skyscrapers and domestic cats are far more deadly to birds.
Monocultural wheat fields are also a highly artificial industrial landscape, just a more familiar one.
The little wind turbines are being replaced with fewer and bigger ones, which are less of a hazard to birds.
I dunno if anyone's experimented with other colors, to see impact on avian mortality.
Note that these turbines are near the highways for a reason. Those who care enough about the view to get out of thier cars will always find windmill-free vistas.
On the other hand, consider the character of the landscape knowing that anyone can see it from a public highway. What you saw had already stopped being wilderness.
It's like receiving a bouquet of flowers and then complaining when they don't last. The same underlying changes that brought you the experience is the one that ensures it is temporary.
EDIT: I see that you might have been wondering about this sentence from the article:
"In addition, researchers are exploring different types of semiconductors to improve the cost and performance of circuit breakers and voltage converters, Sivaram says, and working on superconducting cables that could boost power capacity and cut energy losses to nearly zero."
Wide-bandgap semiconductors like silicon carbide and gallium nitride are already working their way into high power applications. Superconducting energy transmission is much further from industrialization.
They're already being used in the Tres Amigas project [1], though I haven't investigated what the scope of the application is there. I assumed it would be the power transmission since it seems likely to have the greatest losses due to the distance. It's clearly stated that American Superconductor is supplying the HTS wire for the project.
http://www.tresamigasllc.com/docs/HTS-Cable-TA-Energy-Indust...
I say Tres Amigas "was" going to do this because the project seems dead. It lost a major partner in 2015, scaled back a lot, and the project site hasn't posted any updates since 2016.