Ariane rocket suffers from rare launch anomaly
bbc.com
bbc.com
As said probably not a reality for JWST but these high risk launches always concern me with no backup option. What a tragedy it would be.
https://en.wikipedia.org/wiki/Satellite_insurance
http://spacenews.com/space-insurers-warn-that-current-low-ra...
Let’s say you work on the design and implementation of a novel scientific instrument for a satellite for over ten years. That’s a job that, relatively, isn’t paid well, but if launched, the instrument will get you papers and recognition.
If the rocket launching your toy blows up, all you can get from an insurance is money, and that’s not something you value that much in life.
Some satellites also have fairly tight launch windows, for example if you want to intercept a comet.
That's true, but building two of everything causes other problems. For a principal investigator (PI), they spend years drumming up support for a concept then hope that it continues to get funded, built, launched, and becomes operational. If we build 2 of everything, let's say it adds 2/3 to the cost. That means less money for other missions overall. That would make many scientists unhappy.
https://en.wikipedia.org/wiki/Defense_Meteorological_Satelli...
http://space.skyrocket.de/doc_sdat/dmsp-5d3.htm
The out-of-date aspect probably explains why this doesn't happen more. I worked on JPSS-1, a polar orbiting weather satellite. It was a follow on to NPP, but it was not an exact copy. After having experience using NPP in production (in space), naturally improvements and better technology could be integrated. These two satellite launches were separated by 6 years and a new satellite takes 4-5 years to design, build, and integrate. Think how much technology changes in 6 years.
https://en.wikipedia.org/wiki/2012_National_Reconnaissance_O...
"Hey, we've got a pair of better-than-Hubble telescopes just sitting around. Want 'em? You have to promise not to look at Earth with them, though."
Better still, use a swarm of cheap unreliable satellites for the same function (often not possible)
A Dragon spacecraft (which will launch uncrewed with a docking capability sometime this year) or just some satellite bus with an NDS docking ring, should be capable of boosting it if there's a minor performance shortfall like this launch. $150 million, I would guess, would be the cost to address a minor performance shortfall like this. That's not too bad since JWST is a $10 billion spacecraft.
It should be pointed out that the electric-propulsion-equipped spacecraft actually launched will have no trouble reaching the correct orbit, it'll just take 4 weeks longer than planned.
The performance shortfall, based on guesses of the electric propulsion performance and the 4 weeks delay, is probably around 50 to 100m/s. JWST has a budget of around 150m/s, so JWST would, in principle, be capable of moving itself to its planned orbit, but this would signficantly impact its on-orbit lifetime (or require fancy mission planning... I'm always impressed by how clever mission planners can squeeze water from a rock when a problem like this occurs).
So JWST itself may actually have enough propellant in case this problem occurred again, and there is a docking ring on JWST that could, in principle, be used for reboosting it.
It should be pointed out that there was a similar problem with an AtlasV-Cygnus launch in 2016, but the payload was going to a low-energy orbit, so the rocket happened to have enough performance margin that it didn't affect the mission. But if the payload had used the full capacity of Atlas V (like this Ariane 5 launch), it would've been a similar performance shortfall.
Bottom line: no launch vehicle is perfect, not even Ariane 5 or Atlas V. But payload can make up minor performance shortfalls.
Is the JWST designed to accommodate thrust along the axis of the docking ring?
Everything costs money to put into space. You don't just attach a big heavy docking ring with scotch tape. You put is somewhere that material and strength can be useful. With the safety factors involved (wouldn't want to brick a billion dollar spacecraft because you came in a few mm/sec too hot) it makes the most sense to put the docking ring somewhere structurally significant.
JWST is 6200kg roughly. The sunshield is about 150 square meters. Sunlight is roughly 1360W/m^2, so given Einsteins relation between momentum and energy for light: P = E/c, and increase that by a factor of 2 due to reflection (as opposed to full absorption, which would be 1), then we have 9e-6 Newtons per square meter in sunshine near 1AU, for a total of 0.00135 Newtons over the whole thing. Over 5 years, that's 36 m/s of delta-v.
That could be enough to rescue the mission due to a small performance shortfall, if you can point this carefully in the right direction.
(And 5 years is a long time, but not unheard of if you're trying to recover from a major mission failure, for instance the Japanese Venus probe which failed its 2010 Venus orbit insertion and so had to go around the sun a bunch of times and successfully inserted on the next try in 2015 using the attitude control thrusters.)
Further the satellite is going to have to burn years worth of fuel to get to where it's supposed to be.
https://www.reddit.com/r/spacex/comments/6wimhc/ses_switches...
At best, the Ariane 5 is causing these 2 sats a month of delays, and at worst it could render one of them useless. Just because there weren't any explosions or spectacular looking failures doesn't mean this isn't a big deal.
Edit: my apologies, it seems the article has been updated and Orbital ATK has stated that they are confident that the sat will be able to reach the right orbit. (it previously stated that Orbital ATK had not been able to say either way yet).
Still, loss of comms and an incorrect orbit insertion could prove to be disastrous for many payloads. With ArianeSpace's track record, I have no doubt in my mind that many steps will be taken to prevent this exact failure from ever happening again.
JWST is a payload nobody wants to be responsible for blowing up, I don't think SpaceX necessarily wants it on their roster. Even a 1% chance of failure could be too much for what would be a public confidence disaster, likely to cut off significant govt funding and hamper long term prospects.
Amos-6 was an Israeli communications satellite that would've provided satellite internet over Europe and Africa.
The "country equality" policy implemented for contract attribution on the Ariane 5 project by the EU is the culprit.
Once again prioritising feelings over efficiency or common sense.
Side note: there haven't been many rockets that weren't late and over budget. It's hardly unique to the Ariane 6.