Drone footage of Seattle's new 57 foot SR 99 tunnel [video]
youtube.com
youtube.com
I can't find this at Slashdot. I went on for hours and answer a ton of questions. A couple of days later, I was still answering questions. More and more info piled in and we were able to find online documents squirreled away in strange places.
It was a neat write up and a bunch of people helped and asked questions. I'd link it, but it seems to have gone missing.
Either way, it was a hell of a project. I had nothing to do with it. I do know some of the folks involved but was retired before this and I mostly worked East of the Mississippi.
Ah well... There is a lot that goes into infrastructure. It was awesome getting to see it. My favorite work was field work. I'd escape the office and do field work out of dinghy hotels. Someone has to collect the data.
So, I've seen them tunnel, blast, pave, line, and more. I've helped sign crews and driven a grader. None of that was actually a part of my job, but I am a five year old.
Either way, boring holes is tough and things break a lot. Equipment is often single use or rented. It's pretty fancy stuff. It is really just a bunch of men with heavy equipment playing in the dirt and mud - which is as awesome as you might imagine.
I used to get a police escort as I'd drive our data car down the highway. The reflectometer grabbed the data from the lane markings and stored them in the computer in the trunk. I can do that for hours. But, I digress...
You can watch documentaries and see how they bore tunnels. That's like watching a cooking show. If you get to go see it in person, that is pretty sweet.
I wish I could find my previous writeup. Oh well...
The gist of it is, it is loud, dangerous, smelly, and appears to be pretty hard work. I was never allowed to touch the machine, which is for the best. It's like a monster that we've commanded to eat a hole in a mountain. That's pretty impressive.
So, if you are thinking you're burning out, maybe you can go work for the highway department for a few years. They will teach you to drive some pretty awesome stuff.
I had zero to do with the project. Google tells me you're right, but Google also tells me the media called it Big Berth. Don't blame me, blame them.
Virtually no major road projects are put to the voters around here. (Highway 99 is the exception because it was so controversial.) You're thinking of transit projects in Puget Sound which usually have to go through two or three rounds of voting to get fully funded...
To wit, the bill that authorized Sound Transit to hold its most recent vote included several billion in not-subject-to-a-popular-vote road projects. I actually prefer that our representatives control the budget; that's what we elect them to do. But this double standard of "roads are fine but transit...pfft, well, that must be ratified" is obnoxious.
Do you mean light-rail or a subway? Much faster and much quieter.
Also, TFL has taken over some of the regular lines and re-branded them The Overground. These run regular trains.
I've often commuted a couple of stops from London Bridge to Charing Cross, it's short enough that on the way back from work I would often walk or use a Boris bike.
I preferred that route to taking the Underground as it's just nicer travelling above ground, I can't say that it made a difference to the travel time.
These are regular trains at the end of longer routes to the South.
https://www.londondrum.com/transport/train-journey.php?from=...
It’s hard to compare but the maglev seems to operate much quicker: http://www.chinadaily.com.cn/china/2017-06/15/content_297514...
“The maglev line will have eight stations stretching over 10.2 kilometers and will run at a maximum speed of 100 kilometers per hour. The whole journey will take about 20 minutes, including the time for passengers to get on and off”
https://en.m.wikipedia.org/wiki/Alaskan_Way_Viaduct_replacem...
It reminds me of the Caldecott Tunnels --they had to bore a new one to carry all the traffic --but at least you can forgive that because traffic volume was lower when they orig built them.
My complaint is that if you're going to invest a few billion into boring a tunnel, at least make it wide enough to carry all the orig traffic given that adding marginal width is a small fraction of overall cost of building a tunnel.
I-90 is a much higher speed road, though. (Assuming they don't take your suggestion of increasing the speed limit in the tunnel.) Freeway standard is 12 feet per lane (and even the 1940-era Mt Baker tunnels have 12 foot lanes[0]), but again, Aurora isn't a freeway.
Meanwhile, buses are about 8.5 feet wide[1] and easily fit in a 10 foot lane. Most Seattle streets are narrower than that.
[0]: http://www.seattleasce.org/committees/hh/LaceyBridgeReport.p...
[1]: https://cptdb.ca/wiki/index.php/New_Flyer_Industries_XDE60
> The SR 99 roadway width narrows to 25 feet with two lanes in each direction through the BST
> The existing lane width varies from 10.5 feet to 11 feet, and there are no existing shoulders only a gore stripe adjacent to the curb... The existing posted speed is 40 mph.
So there's no real reason we couldn't keep the 10.5 foot lane size, 40 mph speed limit, and do three lanes. The new tunnel has better sight lines and curve radius than the BST. And there's separation between directions, which is better than the Aurora bridge (which also has pretty narrow lanes):
> Many aspects of the existing horizontal and vertical curves do not meet today’s roadway design standards for the posted speed limit. When compared to current design standards for stopping sight distance, horizontal curve radius, and vertical curve length, about two-thirds of the horizontal and vertical curves would coincide with a design speed of less than 40 mph.
If the spacing of the cars is the same between the two, then a 60 mph lane is moving more cars per second than a 40 mph lane. The spacing never is the same, though, unless these are autonomous cars.
Also, throughput is limited by bottlenecks. If an upstream bottleneck has throttled things to one car every ten seconds, it doesn't matter whether the downstream lane is 30 mph or 60 mph.
Spacing is a function of speed. Even with autonomous cars spacing is not constant because there are on and off ramps so some will be accelerating or decelerating. We don't even know how those cars will work, maybe you can pay more to drive faster!
The question here is which configuration of the tunnel will maximize throughput.
I can't find any explicit statement of the planned speed limit but I did find a document [1] that implies there will be variable speed limits much like other highways in the area.
[1]: http://www.wsdot.wa.gov/Projects/Viaduct/Media/Default/-NewD...
I'm not a transit engineer but I do think this is one of the drawbacks in the kind of radical democracy we push in Washington. Everything goes up to a public vote, even things the public can't really fully be experts on.
For better or worse Seattle city planners have taken a car-hostile approach to try and force people onto public transit. Unfortunately they also can't figure out how to pay for enough buses and trains to get everyone where they are going.
Also, my understanding is that there will be a surface street where the current viaduct is which combined with the tunnel will allow downtown access and increase capacity beyond what we have today.
Tunnels don't use land.
There is limited subterranean land as well.
If that's the definition we're using, then I'd like someone to show hostility to an interest of mine by spending billions on it.
When the project is complete capacity will be the same or slightly larger than the capacity of a roadway built in the 1940s. Seattle has doubled in population since then. The current viaduct barely serves our needs and the new tunnel and surface street combo will not solve the transportation problems alone. We need fewer single occupant vehicles.
Cars are not given top priority in project planning. Just because one tunnel and one road are being put in place does not change that. There are transit corridors downtown that do not allow cars. Most downtown streets are a maze of one ways that make navigation difficult. Parking requirements for new construction are continually relaxed, reducing available parking across the city. Car tabs are expensive to fund for transit and discourage driving. Seattle has a lot of anti-car policies.
Planners here would like to spend more on building out our light rail and increasing bus/bicycle ridership than they would on adding subterranean exit ramps to a bypass tunnel.
e: Seattle's public transit system is largely bus-based so new road construction tends to take that into consideration with reserved lanes and stops and little attempt to serve the volume of cars.
Also, I don't think anyone claimed the tunnel project was supposed to solve traffic problems. The issue is that the viaduct itself is old and unstable. The tunnel is a combination of a safety improvement to a state highway and a subsidy for Olympia's favorite construction companies.
So a six lane tunnel probably cost more than twice of four lanes.
In any event, some of the original proposals were for six lanes --wished they'd carried that out.
Given a constant length and homogeneous ground composition (conditions that apply to the current discussion)... It makes a lot of sense that the cost is proportional to the volume being removed.
For a given tunnel length and ground composition, the cost is proportional to the area of the cross section.
There were quite a few cuts as well, so I don't see any challenge there
True story: I loved the movie Cocktail with Tom Cruise. I set out to learn all his bar tricks from the film, including lighting a match with one hand. Took me two months and many burned fingers before I mastered it. Then, I re-watched the movie to make sure I was doing it right, only to realize it was an editing trick and he never really did it. Oh well. I learned a skill for life.