Milpitas BART Station to Open in December, VTA Says
eastbaytimes.com
eastbaytimes.com
Some time ago I wrote that the geography of the Bay is unfortunate for transit in many ways [1] but notably because there's no express way to get from one side to the other; instead you have to travel along the Ring touching all stops between.
One of the later plans of the HSR along the Caltrain corridor wants to operate it as a hybrid system (which sounds like a big deal, but really just means operating express and slow trains on the same corridor), which would greatly improve mobility between Downtown SF and SJ, as well as regions adjacent to those with zoned trains. Similarly, the Dumbarton Rail Corridor (between Fremont and Palo Alto) would provide a radial transbay option.
It's generally better to invest up front on a bridge or tunnel. You wind up with a much, much lower cost for daily operations...
More info here: https://dumbartonexpress.com
EDIT: To head off one complaint: Yes, it's an expensive trip ($4.20 one-way). But, if/when Dumbarton rail gets off the ground, I would expect it to cost the same or more.
[1] http://www.sfgate.com/news/article/Mysterious-Fire-On-Trestl... [2] https://web.archive.org/web/20160318141356/http://www.smcta....
If you live there and are trying to get to the city, good luck finding a seat, plan to stand for as long as 30 minutes in a crowded cart.
I hope they thought this through and are adding more trains so that it doesn't make it even more unbearable.
tl;dr: They need 30-40 more cars. Testing on 10 new ones has found issues (which is the point of testing). Contract says 25 more should arrive by the end of 2017.
I understand you're going to need more maintenance personnel, etc, but 162 additional staff for two stations sounds like a concession to the unions. Which in the grand scheme of the whole system might be defensible--more employees as a compromise for capping wage growth. But let's call a spade a spade.
[the VTA] is building the new station and handing off its
operation to BART once complete
Then later on Alicia Trost, a BART spokeswoman, said her transit agency
will ramp up to hire 162 positions, funded by and dedicated
for the Berryessa extension. She added BART is estimating it
will cost $27.5 million to provide service at the new
stations.
Finally, VTA will reimburse BART for the cost for staffing the two
new stations.
I missed the last part the first time through. If VTA agreed to reimburse BART for operating costs, then as a union negotiator it would seem an easy sell for BART to hire an excessive number of employees given that they wouldn't be footing the bill. And in any event, it would be in BART's best interest to inflate its operating cost estimates for the two stations to minimize its risk going forward. Inflating the number of positions needed is one way to do that.Also, to be clear, the "Next Network" affects more than the lines connecting to BART, but the opening of the new stations is one of the main reasons for the reorg (another is a change to the coverage/ridership ratio).
More info here: http://nextnetwork.vta.org
For most of the East-Bay-to-South-Bay segment (from Santa Clara to around Fremont), there is only one track. That's not unusual in freight rail, but what's missing here are passing points: Long sidings where one train can get out of the way of a passing train.
You can see the route around the bay here: https://www.youtube.com/watch?v=yoyZC4LvKoI
Also, Union Pacific owns the tracks used by the Capitol Corridor, so priority becomes a question: Yes, passenger rail is supposed to be higher priority, but UP can (and does) charge Amtrak for using the rails. Railroads can (and have) demand that passenger railroads pay to build/upgrade infrastructure as a condition for running more passenger trains.
So yes, it would be doable, but it would be _expensive_.
But its irrelevant till you double track Alviso.
In the 90s, San Jose built light rail from useless point A to other useless point B. I couldn't use that, either. So I was still driving everywhere.
I live in the Seattle area now. Still no happy ending, though there was a huge push for a transit expansion (and a corresponding tax increase), and I hear we'll get light rail in our area in maybe ten years. That'll be nice.
I laughed at this, but you're right. VTA built the slowest, dumbest light rail system I've ever used. It was nice, and I used it on occasion, but very rarely.
I thought the same thing about DART in Dallas 10 years ago, but it's spread out quite a bit now, finally reaching to DFW Airport and Dallas Love Field.
https://www.dart.org/maps/printrailmap.asp
Maybe VTA will continue to grow like that. One day.
- Drive to Sunnyvale (15min) and then take CalTrain to SF (45-75min)
- Drive to the Great Mall (30 min) and then take BART to SF (60 min)
Would be nice if they let them electrify CalTrail or bring Bart all the way south. I can keep hoping!
Given ~95% of households in the locality own cars, I assume this extension is addressing congestion or pollution; it's hardly a $2.3 billion investment so 77k people don't have to drive as far to the next Bart stop. I wasn't suggesting taking cars away from people, I was trying to make the existing roads work better, not just in the locality but throughout the area.
[] http://www.governing.com/gov-data/car-ownership-numbers-of-v...