PSLV-C37 Successfully Launches 104 Satellites in a Single Flight
isro.gov.in
isro.gov.in
a) Cartosat 2 Series - primary payload.
b) 88xDove (88x3U CubeSats) - 22 QuadPack deployers.
c) 8xLEMUR (8x3U CubeSats) - 2 QuadPack deployers.
d) BGUSat (3U CubeSat), PEASSS (3U CubeSat), DIDO-2 (3U CubeSat), Al-Farabi-1 (2U CubeSat), and Nayif-1 (1U CubeSat) - 1 QuadPack deployer.
e) INS-1A and INS-1B are not in CubeSat format. So, they need to be mounted separately on payload adapter.
So, 1 primary payload + 25 QuadPack deployers + 2 nano-sats in total.
Pics of Quadpacks at: https://spaceflightnow.com/2017/02/14/indian-rocket-set-to-p...
An aside, your username tells me a lot about you :)
I believe in self-taught knowledge.
Curious: when satellites are ejected this way, is it controlled (as in, do they control the ejection velocity etc.) or is it just "dropped" out?
https://www.planet.com/pulse/planet-launches-satellite-const...
It is now the largest private satellite constellation ever.
https://twitter.com/prasarbharati/status/831786401620451330/...
From what I understand, these satellites were injected into the heliosynchronous orbit (https://en.wikipedia.org/wiki/Sun-synchronous_orbit) at different slots, different angles and at different times.
However, the sole idea behind deploying 104 satellites is not to create a record of some sort but to utilize the maximum capacity of the workhorse rocket (PSLV). This results in greater ROI for the Space Agencies (Antrix / ISRO) as most of these 104 satellites (101 I think) were foreign satellites.
According to this article: http://tech.firstpost.com/news-analysis/isro-to-recover-half... ISRO will recover half of the total cost incurred for the launch from foreign satellites mounted on the PSLV.
+1. The PSLV is one of the world's most reliable launch vehicles. It has been in service for over 20 years.
Next is to accurately inject all those satellites - either into their respective orbits if it's a multi-orbit mission, or with sufficient time gap and re-orientation between injections if it's a single-orbit mission.
This was a single orbit mission (all sats released into SSO). So, PSLV's 4th stage had to time those 104 satellite injections. It also need to re-orient itself for each injection depending on satellite's requirement. This mission had as many as 103 "separation events". All this logic is pre-programmed and executed by launch vehicle's onboard computer.
Check out QuadPacks lined up before the launch: http://blog.isilaunch.com/the-quadpack-line-up/
And, check out those QuadPacks mounted on PSLV payload adapter around primary payload: https://imgur.com/a/LM9Cp
http://www.isro.gov.in/pslv-c37-cartosat-2-series-satellite/...
The question is when, CubeSats will be the primary payload.
> Doesnt the orbit get crowded?
Hope you'll have the answer here: http://www.popsci.com/space-junk-why-cant-we-see-satellites-...
As long as their orbital information is properly registered and they have a proper end-of-life plan for them there's little risk in deploying new satellites; if you want to get concerned about crowding the orbits, China deliberately blowing up a satellite a couple of years ago was much more problematic.