[1] https://www.google.com/maps/d/viewer?mid=1NYS0Y3nyyYZowXFDtJ...
[1] https://www.google.com/maps/d/viewer?mid=1NYS0Y3nyyYZowXFDtJ...
Therein lies the problem. The cost of the line can't be justified unless it provides a viable alternative to flying between SF and LA, because that's the only conceivable way to get enough ridership. The problem is the distance between SF and LA means being competitive with flying in terms of travel time is incredibly difficult. To achieve parity the trains will need to average around 220 MPH, which is incredibly optimistic. Existing high speed rail lines rarely run at 200 MPH even momentarily due to high operating costs.
All this means that most trains will have to run nonstop between SF and LA to even have a hope of competing with flying. If the trains fail to draw passengers away from the airlines, ridership will be far too low to sustain the line without absurdly high subsidies.
If you can get the trains to take you directly into the city center, it can often be a better option.
That's because Boston and NYC are both navigable without a car. Only one side of the SF-LA link can claim to be close to that ideal.
But the time and hassle of airport parking and security and delays might be able to keep a 3.5 hour train ride viable even in CA. That would require a train system that allowed passengers to step through a quick scanner with no line and onto the train without queueing or carefully organized boarding. Lots of train systems used to do that in the USA but the bureaucrats don't like passengers freely walking around platforms by heavy machinery or directing themselves or quick predictable security procedures. Acela has been abandoning efficient and established traditional practices to copy instead the airports. How long are they going to stand for a train system that isn't as awful as airport security and boarding?
Since politicians can't risk being blamed for trouble, we have no ability to control the bureaucrats and every high speed transportation system will inevitably get to be as bad as airports.
If rail could be built at the same costs as in France or Japan (or even, optimistically, Spain or Korea), to wit, $20-30MMM, you could justify it just for saving the cost of airport expansion. But at $80-120MMM it's lunacy to proceed.
You'd have to actually change the rules and overcome the NIMBYs. Some problems can't be solved with cash.
Just put some car rental places near the station in LA, just like is done for airports.
If the answer to arriving in LA is "you need to rent a car in any case" (which it often will be), then you lose one area of train potential advantage.
I avoid flying like the plague but I'll do it if morning meeting and can't go down night before.
That means I leave for the airport 75 minutes before my flight, fly for 1 hour, arrive in JFK/LGA/EWR, and then take about 30-40 minutes of public transit to my destination in Manhattan. And that's the ideal.
There's some break-even point for travelers between the more relaxed pace of train travel as opposed to the efficiency of air travel, but BOS - NYC is still within the realm of the train, even at Amtrak speeds.
Really?
Zaragoza to Barcelona does 310kph and very smoothly too. Much more comfortable than flying: https://dilemma-x.net/2014/03/14/high-speed-rail-in-spain-is...
I have no trouble imagining that the train can compete with flying between SF and LA. Even if the train has to stop in several backwater towns along the way.
The shuttle flights between SFO/SJC and LAX are completely unreliable. When I was doing the SF-LA haul regularly, I'd be delayed (delayed!) by 6+ hours at least once per month. That's longer than it takes to drive. Do you really think the high speed train will take that long to travel between LA and the Bay Area?
So what if the minimum time of the train is a little longer than a flight? The expected time enroute is still much less.
There are a whole host of additional problems that affect rail travel that you never have to think about with air-travel.
Currently, Amtrak OTA is 80% - so that means 1/5 of your trips will experience a delay of some sort.
If it were all controlled by the Government, like it is in other countries, nobody would need to have 'priority'. You just schedule the trains properly.
What qualifies as commuter rail? I think most of Amtrak's cross-country tracks would probably not be considered intercity or commuter lines.
The real issue is that often operationally, a passenger train has to stop for a freight train. If you have a 1000' siding that you have to have a 6 car passenger train pass a 30 car freight train at, the passenger train is going to have to stop for the freight train. That doesn't even take into consideration other factors like how freight dispatchers don't like to stop hazmat/"hot" trains for safety reasons.
The reality is:
1. if the siding is only 1km long - the Amtrak train is taking the siding as the freight train will not fit on it.
2. if the dispatcher decides the freight train goes ahead of Amtrak -- there is no lawyer around to argue the point.
3. if there is a long section of single tracking, with freight backed up the opposite direction, the dispatcher allows the all the same direction freights to move. ( 2+ hour delays when that happens )
4. If there is enough of a delay and a freight train crew in front goes outlaw - then that train stops until a replacement crew is brought in... which usually results in the Amtrak crew going outlaw as well.
It has gotten a lot, lot better and the scenery is beautiful - but please don't kid yourself about the realities on the ground. Amtrak has to stay in the good graces of the railroad companies especially with a hostile congress.
Of course OTA % doesn't account for the size of the miss and I've heard plenty of stories of long distance trains sitting for hours while multi-mile long freights go by.
Several times I've been on the Downeaster headed to Boston and gotten shunted onto sidings, to the point that we got an hour behind schedule.
I'm curious how that happened to you - I used to fly SFO-LAX from time to time, and was surprised that they didn't even really worry about me missing my flight - they just told me to catch the next one in line. United runs 27 flights daily from SFO to LAX, and presumably have some extra planes they can inject into the system if needed... (SFO is a United Hub)
That's just United. Southwest (and I'm pretty sure Jetblue and Virgin) has numerous flights to all airports in the greater LA area: https://www.southwest.com/thmpg/flights-from-SFO-to-LAX.html
Mostly a combination of needing to travel at particular times to particular airports.
The last two flights from SJC to LAX each evening seemed to be the most often delayed. You can't exactly hop on the next flight if it doesn't leave until the following morning.
Morning flights to SFO are often delayed due to weather, and fighting peninsula traffic to get to work sucks. BUR-SJC on Southwest would have been optimal from a flying perspective, but LAX was a shorter drive.
Especially if the train stops in "several backwater towns" (Fresno and Bakersfield ain't particularly glamorous, but I'd hardly call them "backwaters"; I digress...), this will automatically be more useful than just an ordinary flight between SFO and LAX for that reason alone.
In addition, the time required to travel from each airport to where you actually want to be can be much less, since train stations can be built much closer to major metropolitan areas. Plus, weather is far less of a problem; when the planes at SFO are grounded due to fog, the trains will still run on time.
For me, the line is effectively useless without Phase 2 (since that connects to Sacramento). With Phase 2 added, you'd have a high-speed connection to all four of California's major cities, significantly improving the already-pretty-great utility of the line.
Also, again: weather is still a major factor for any airport.
He would take such a train.
Another thing is that a one hour flight from SF to LA means, 30 minutes to airport, 30 minutes to get through gate, 15 minutes to board, 10 minutes on tarmac, an hour flight, 10-20 minutes for landing/deplaning, 15 minutes to ground transport.
So, two hours seems ballpark.
Trains typically don't have as much security and boarding is simplified. I'm thinking plane and train travel times door-to-door would be comparable.
Finally, train seats are usually much more comfortable than seats on domestic flights.
I think a substantial number of travelers would use the train instead of flying.
And people can't understand why large swaths of the population think well-off techies are out-of-touch.
Every Amtrak train I've been on (which, of course, is not the model of efficiency) takes on the order of two or three minutes for most intermediate station stops, if not less. The train stops, people leave, new passengers enter, and it starts rolling again. Stowing/gathering belongings, getting seated, lining up at the exits, and ticketing is all done while the train is in motion. It's not like having a flight layover.
Plus, we could see added environmental impact taxation for short-hop flights (carbon tax, if nothing else) that would raise airfare costs.
I'd wager a lot of people would take that. Once you factor in arriving at the airport an hour before your flight, along with the time taken to get to/from both airports to the actual centre of the city as opposed to where the airports actually are, 1.5 hours actually starts to sound like an improvement.
Germany uses 300km/h on some tracks. Here the view from a train at that speed overtaking cars on the Autobahn:
https://www.youtube.com/watch?v=Js3XDTE5Iyg
China learned from it, here using a version of a German Siemens ICE train, Shanghai/Beijing in under five hours. https://www.youtube.com/watch?v=xvytUaRs2dU
France and Spain have those tracks in Europe.
The newer German tracks with 300km/h are operated at 300km/h with the ICE 3. Even through towns and tunnels. It's not the average speed, but a typical cruising speed on those tracks. France has more and longer high-speed tracks, thus the high-speed trains operate at higher average speed than in Germany.
Operating at 300km/h and beyond is indeed expensive. As are high-speed train in general. Still Western Europe now has an extensive amount of high-speed tracks:
https://upload.wikimedia.org/wikipedia/commons/b/bf/High_Spe...
350 nowadays, that's the rating for the latest LGV Est although the current trainsets are only rated for 320.