Also, how frequently could one of those trains run?
Also, how frequently could one of those trains run?
https://www.transporteca.com/transportpedia/sea-freight-air-...
http://richardtorian.blogspot.com/2012/01/cost-per-ton-mile-...
Even if it didn't out preform ships, it outperforms trucks. That would feed the market for faster shipping of small volumes vs slower shipping of larger orders.
I work for a shipping company btw. Don't have experience about the prices globally, but that source divides data from two completely different sources. That often doesn't end well.
There are companies tracking the average price of shipping a container across various trades.
Anyway, this is fixable. Planes and ships are not.
US is at 15%.
https://en.wikipedia.org/wiki/List_of_countries_by_electrici...
Renewables are clearly going to be a growing part of the energy mix, but the issue of base load is still an unanswered question.
https://electricitymap.tmrow.co/ https://en.wikipedia.org/wiki/Nuclear_power_in_Germany#Closu... http://www.platts.com/latest-news/electric-power/warsaw/poli...
More likely, you'll see one train per day, mainly because of choke points like the Eurotunnel. It's also likely that cargo will have to be moved around at least once, since rolling stock (train cars, etc.) aren't normally certified for high-speed running. Plus, you've got a mix of at least high-voltage AC (for Eurotunnel) and diesel, so there would be engine changes. Plus, many USSR countries aren't on "standard gauge", so you either need rolling stock with wheel sets of different gauges (widths), or you need to move cargo at specific transfer points.
In this case it's not a track at all, more like a schedule that uses different kinds of tracks and is actually run by different companies along the way. The track is also not owned by one company (like in the US), but by a different operator in each country. According to an article, the train set is changed twice for the trains coordinated from Germany.
Eurotunnel is likely not the choke point here (they could just load it on a ferry and only lose 1-2 hours), it's the change of rolling stock along the way, and other traffic it has to share the track with.
A proper, dedicated track could probably bring huge economic benefits for everyone involved, but I don't see that coming. As long as volume is low, none of the states the freight goes through has leverage (could still be shifted back to air/sea) which somehow guarantees that it works.