More details at
http://www.filtsep.com/view/44376/success-behind-advanced-sw... :
> Minimizing the plant's environmental impact: Pipe jacking .... Other measures: the potential impacts of the Sorek Plant's operation on the environment were thoroughly assessed, and appropriate measures were taken to prevent, minimize and mitigate these. The following are some highlights of these measures:
> – The feed water pumping station is located far (2,400 meters) from the coastline, and feed water flows by gravity to the on-site pumping station.
> – Entrainment and impingement effects at the intake system are minimized, thus minimizing the consumption of electricity and chemicals (especially CO2) and reducing the emission of related greenhouse gases, air pollutants and noise.
> – Environmentally-friendly antiscalants, and inorganic and treatable cleaning solutions, are used.
> – Brine is discharged back to the sea approximately 2 kilometers offshore, and at a depth of 20 meters through a specially designed outfall system (diffusers) that enhances quick brine dilution to the seawater body. The critical parameters of the brine disposal are monitored online, 24/7.
> – The plant is equipped with a special sludge treatment system to treat any effluents generated in the process. This system removes all suspended matter and only clear water is discharged to the sea.