Tesla's New Gigafactory: Stats in the Construction Permits
inverse.com
inverse.com
Your math is incorrect, $332.6 million divided by 5.8 million sqft is $55.60/sqft.
Hope he's not a financial reporter.
> if my math is correct, means building the damn thing is costing Tesla $55.6 per square foot. And that’s just the estimated cost of the contracts so far.
Based on a quick look[1] that's a totally average price per square foot for an industrial building. AMAZING.
> 9. The whole thing has already cost $322.6 million.
> The total cost of the contracts awarded is skyrocketing toward half a billion dollars (though it has a ways to go to meet that mark). The factory itself is 5.8 million square-feet, which, if my math is correct, means building the damn thing is costing Tesla $55.6 million per square foot. And that’s just the estimated cost of the contracts so far.
$322.6 million / 5.8 million sq-ft => $55.6 per sq-ft -_-
//edit all 3 of the first comments were about the math. Love you guys!
Sigh, I hope this was a joke.
That it should have sufficient solar power to drive production is commendable but I am curious if they are going to have some onsite storage mechanism as I assume this is a 24x7 facility.
The amount of materials that have to be brought in by rail road would a statistic I would find mind boggling. How much water does the plant consume?
Shouldn't that read less efficient?
Assuming their battery technology is competitive there's going to be no shortage of companies interested in their batteries.
Also the Tesla Model 3 at $35k (before tax incentives, etc) is barely in luxury vehicle category.