Exploring the Elizabeth line, one of the world’s largest construction projects
arstechnica.com
arstechnica.com
Image that shows what they did here: http://s3files.core77.com/blog/images/2015/01/Crossrail_Plan...
Not on iPlayer any more but you can buy it on DVD if your don't think tunnelling is boring. :)
http://www.londonreconnections.com is also a detailed resource.
There's a movie plot in that, but I'm not sure if it's a "mad scientist destroys London with TBM" plot, or a "heroic genius saves London from zombies with TBM" plot, or a "Bruce Willis foils terrorists in London with TBM" plot.
I guarantee those machines get referenced in a movie / book in the next decade :-)
Good thing on the large diameter though, IME many of the tube's older sub-surface lines are unfortunately (and uncomfortably for modern average heights) small.
(The Central, Jubilee, Northern and Victoria lines also use automatic operation to similar levels as the DLR, it's just less obvious as the train operator still has a separate cab).
There is no such need. Lyon's line D has been running fully automatic since 1992 without platform doors[0], the only major accident has been a drunk falling on the train having jumped from a mezzanine.
> allows the conductor to take control in the case of a
> complete (or widespread) signalling failure
Or, having ridden that line as part of a regular commute, whenever the conductor gets bored.Most automatic trains can't be driven by humans under normal circumstances because signaling information is fed to the train far faster than any human could react to it.
On current tube and big railway trains, that member of staff is the driver. On the DLR, it's the train captain. On an automated Crossrail train, it could be a guard (it's buses that have conductors!).
It's to be 25km / 16mi long, and mostly run under the river, and should take 9 years in total to build.
http://www.crossrail.co.uk/news/articles/crossrail-to-become...
I think the desire to see the greater system decomposed into various properly named subsystems in the most coherent way possible is something that is characteristic of a software development mindset.
This video clears it up somewhat [1].
Visitors to London especially don't need to care about this, and the name tells then to treat it like the other underground lines: there will be trains every two minutes, and a special ticket isn't required.
Also, Crossrail 2 is being planned.
Excellent, I've been trying to figure this out; whether I will be able to just jump on/off using my debit (or Oyster) card as I currently do on the over/underground.
Any idea how far out of town this ticketing system will be usable? Will someone in Reading be able to use a contactless card without having to buy a paper ticket?
Note that you can also use contactless or Oyster on National Rail within the zones, e.g. King's Cross to Alexandra Palace or Moorgate to Finsbury Park.
> Any idea how far out of town this ticketing system will be usable? Will someone in Reading be able to use a contactless card without having to buy a paper ticket?
At the moment no. One would hope that common sense will prevail.
If I recall correctly, this is already the case on the other side of Crossrail (Shenfield/Brentford). It's also been introduced at Gatwick Airport recently.
Main site: [1]
Your city may be different but wheelchair accessible stations are a rarity in London.
I met a guy at an after work thing a few years back, somewhere in the city, who said he worked with contingency planning for TfL. I asked him, what's the plan if there's a fire in the tube, one of the older lines where you're deep, deep underground, and there's heavy smoke development? His answer wasn't very re-assuring: "we pray."
Since that day I very rarely, if ever, take the tube anywhere. If I do I make sure it's on off hours when there aren't as many people on board or in the stations. Irrational fear, for sure, but coupled with the extreme amounts of people you may find, with people literally jammed up against the walls, I figure I'd rather spend a few more bucks on a cab, or just spend more time walking.
(Also the signs in various stations, King's Cross for instance, commemorating the victims of accidents and/or attacks aren't really re-assuring.)
> Also the signs in various stations, King's Cross for
> instance
Which happened in 1987.There was a huge investigation into the causes of the King's Cross fire, and many changes implemented as a result [0]. The investigation even led to the discovery of the Trench Effect [1] "a combination of circumstances that can rush a fire up an inclined surface".
FWIW, Crossrail is on this list of the 25 "most impressive" projects - http://www.popularmechanics.com/technology/g2121/the-worlds-... .
https://en.wikipedia.org/wiki/List_of_transport_megaprojects describes it as a "megaproject", and I can agree that everything which is a megaproject is one of the largest construction projects in the world.
Looking at the list of projects which are "under construction", and ordered by cost, Crossrail is #6 at US$25B and the GBT is #10 at US$10B.
Crossrail: 20 million man hours three years ago http://m.londonlovesbusiness.com/business-news/london-transp...
I'd love to see some more reliable figures, though.
[1] https://en.wikipedia.org/wiki/List_of_transport_megaprojects
Crossrail is large in the context it has new stations, depots, extensions, trains, and the very large amount of traffic it is expected to take under a very short construction period.
Looking at the entire picture doesn't make the number seem ridiculously high. If it seems to high you need to look at where it's all going its not just for a tunnel.