Electric Generation in Spain – Latest 24 Hours
energia.ningunaparte.net
energia.ningunaparte.net
I agree it's neat, but I dislike that the plot legend has the text at an angle with poor contrast and in the "wrong" order compared to the plot colors. I'd also like a better color scheme with more distinct colors. I'm also not s fan of fading out the colors with time.
Service Temporarily Unavailable
The server is temporarily unable to service your request due to maintenance downtime or capacity problems. Please try again later.
The other thing that's perfectly obvious on this graph is the comparison with 24 hours ago.
My nitpick is that this is ultimately a stacked bar chart, so as with cartesian stacked charts, it obfuscates some of proportions, in particular the very interesting cyclicity of renewables. The author has wisely put the higher-variance variables first, mitigating the problem somewhat, but not completely, as can be seen by comparing to the gridwatch UK equivalent.
Not happening.
Default styling can be spotted a million miles away
Does the percentage of renewable generated (wind) go up a lot during the night?
edit hrm. Tis back now.
HN hug-of-death, maybe?
You can view the PJM's network issues by clicking on "Constraints" or "Emergencies". Typical message today: "As of 17:10 on 11.20.2015 a Post Contingency Local Load Relief Warning to maintain WARD 115 KV at 106 KV in the PN area has been issued for Transmission Contingency Control. Additional Comments: Pre-contingency voltage too high for caps at Mansfield and Niles Valley" Minor problem, already handled. If you really want to understand all this, PJM has lots of training materials. Start with "PJM 101".[2] Anyone running a big network or "cloud" may find it useful to see how a very large power grid is run. The main control room in Valley Forge, PA usually has less than 10 people.[3]
[1] http://www.caiso.com/outlook/SystemStatus.html [2] http://pjm.com/Globals/Training/Courses/ol-pjm-101.aspx [3] http://www.elliottlewis.com/pjm-mission-critical-site/
Earlier this year a major construction project has ended: a double 65km tunnel below the pyrenean of 1000MW capacity. It doubled the previous existing capacity.[1]
Spain is a very large importer of energy, ENTSOE data for October is 525GWh FR->ES [2] Since the energy mix of France is roughly 75% Nuclear, in reality Spain relies much heavily on nuclear than what is displayed.
Based on ENTSOE data, Fraunhoffer built another very nice data visualisation of import/export of electricity between Germany and its neighbours [3]
European electricity networks are very tightly interconnected, and although I don't have a source at hand, I remember being told that preventing a domino effect between countries has been a massive feat of engineering. Basically, the fear of every energy provider/network is something similar to the blackout that happenned in northern america in 2003[4]
As a side note does anyone know what "balearic exchange" refers to? I guess something the Baleares islands, but my google-fu failed me
[1] http://www.inelfe.eu/?Liaison-electrique-souterraine&lang=fr
[2] https://www.entsoe.eu/db-query/exchange/detailed-electricity...
[3] https://www.energy-charts.de/exchange.htm
[4] http://www.nature.com/news/is-the-us-grid-better-prepared-to...
Exports and Imports vary depending on the season. From January to April, when the most hydro power is produced, Spain is a net exporter to France and a net importer from Portugal. The rest of the year, the balance is mostly reversed. The export to Morroco is roughly stable all year.
In 2014, Spain's nuclear power plants produced 57,376 GWh. Assuming all energy imported from France (5963 GWh) was from nuclear plants, that would add 10.4% to nuclear-source electricity, for a total of 63,339 GWh, or 26% of consumption (vs. 23.6% if you don't count French imports).
Edit: source for all that: http://www.ree.es/es/publicaciones/sistema-electrico-espanol...
Shows a breakdown of how the energy is generated and where it is going.
The sun set a while ago ...
https://demanda.ree.es/demandaGeneracionAreasEng.html
If you look at this report, you can see in the annual report that pumping 'costs' around 6GW a year.
http://www.ree.es/sites/default/files/downloadable/prelimina...
> Melting about 70,000,000 pounds (32,000,000 kg) of salt takes two months.
The wind energy itself is cheap, but all producers are paid at the cost of the most expensive dispatch!
The scheme includes energy generated from waste, biomass, hydro, wind, solar and co-generation. Since hydro, wind, solar have their own categories, that part of the graph would correspond to waste, biomass and co-generation.
So a micro hydro plant or a rooftop solar installation would be counted under the special scheme.