Why New York Subway Lines Are Missing Countdown Clocks
theatlantic.com
theatlantic.com
> That’s why the MTA has tried to associate CBTC [a enormous overhaul of the signal system for the subway] with countdown clocks. New York riders crave realtime information about trains. They don’t care how they get it. So when Transit wants to drum up support for an obscure, costly, many-decades-long capital project to upgrade to CBTC, they always point to the clocks. (“Sustained Investment Makes Real-Time Information Possible,” declares one 2012 press release.) Reporters, struggling to make sense of a half-dozen interrelated projects, follow the MTA’s lead and assume that realtime train-location information depends on signal upgrades.
> But that would make for some pretty expensive clocks, and it would make them awfully long in arriving. The F train, for instance, if it had to wait for CBTC to get realtime arrival information, wouldn’t see it until 2035.
>It’s a misleading narrative. You can get countdown clocks without touching the signals. The MTA knows this.
The analolgy with the ACA website comes at the end:
> I keep thinking of Healthcare.gov. Everyone knows that the initial project was a costly disaster, but less well known is that a small team came along and saved it. The story includes this remarkable fact: The old system cost $250 million to build and $70 million a year to maintain. The new system—which actually worked—cost about $4 million to build; its yearly maintenance was about $1 million.
CBTC, without the unnecessary legacy system kept around who-knows-why and without the overstaffing kept around because of union contracts, should be the desired end state. And there's no great reason it has to take another 175 years or cost another $20B. To bring that end state modestly closer I'm happy to wait a little longer for arrival clocks -- YMMV.
To me this story is one of poor political oversight, terrible middle and upper management both in terms of day-to-day operations and in terms of bidding/ working with contractors, and overly powerful public sector unions. To anyone familiar with the MTA none of these come as any real surprise.
Of course, that's how requirement creep often sets in. Wouldn't it be cheaper to just throw another feature in there while we're at it? That has to be cheaper than building a whole other system right? What is missing in that original function is how adding in the requirement for countdown clocks powered by CBTC increases the cost of CBTC itself. This plays out over dozens of features big and small, and next thing you know you have the F-35.
I'm relatively familiar with this story already so I wasn't shocked by the countdown clock portion of the system. I think everyone at the MTA knows that you could build a system that just provided countdown clocks for passengers for not that much money. Keep in mind the ATS system they mention that powers the A division countdown clocks is actually as safety critical as CBTC and therefore is engineered (and priced) like an airliner. It's not priced like an Arduino broadcasting the trains location to receivers that guesstimate when the trains will arrive but only works 95% of the time.
The real meat of the story for me is that the MTA doesn't have a realistic plan for rolling out CBTC at all. They basically have the constraint of never shutting down a subway for a significant period of time, and also that to realize the savings from CBTC you have to eliminate the block control system from that stretch of line. It seems like they can't make a hybrid system work unless it covers the entire line (that's why they started with the L).
I think if they work on that core problem the whole thing becomes tractable. How do you safely manage the transition of a train from a CBTC "block" to the old style block? If they do that then you can start at the end of the line and incrementally rip out the old system and put in CBTC through weekend work. They were able to replace the entirety of the 7 line's trackage in about 2 summers, and if they didn't have replace the old style signals it sounds like it's not much more work than that to bring in CBTC.
The MTA has countdown close, just only on the IRT lines. And the MTA has an API for both subway and bus times.
Check out some of these crazy layouts, like the Dekalb area or the 47-63rd St map: http://www.nycsubway.org/wiki/New_York_City_Subway_Track_Map...
They try and explain it to the public: https://tfl.gov.uk/campaign/tube-improvements/behind-the-sce...