This is not a production-ready technology, though. I believe there are lingering problems with corrosion. And the claim that the MSR doesn't require secondary water cooling is odd: what's the turbine working fluid heat dump supposed to be?
I really object to phrasing energy policy as either/or. Build out renewables, now, because that's ready. Let's give the MSR a fair go at getting to production-ready, see if the problems can be worked out.
Let's not build a nuclear plant whose output is subsidized to twice the normal wholesale cost: http://www.bbc.co.uk/news/business-22772441