Structured Procrastination: Do Less, Deceive Yourself, and Succeed Long-Term
structuredprocrastination.com
structuredprocrastination.com
Yes has me start on it and either complete it or hit a snag. If it's a snag, then I'll analyze it briefly and then go back to procrastinating until the subconscious has worked out another approach.
No is perceived this as a feeling of "Nope." I've attuned myself to this feeling and have learned to listen carefully to it. Many, many times, especially with work tasks the reason for doing that particular task will have evaporated by the time I'm ready to do it.
Other times I find I needed to clear my mind before the subconscious can present to me the right way to go about it. So I'll read articles so as to purge my mind of the attachment (in the Buddhist sense) I'm feeling to the task.
Sometimes it takes days / weeks / months for this attachment to clear up. I have a task I've been wanting to do sit in my reminders for 2 months now. It will stay until I'm either comfortable removing it or actually doing it.
"Don't worry boss, maybe next week my subconscious will come up with a brilliant solution that will sink our competitors. You'll see."
A little planning goes a long way. You can avoid doing things like planning and wait days/weeks/months for your attachment to the task to clear up. You can also plan out what you'll need to accomplish a task and once you're done, your mind can essentially go on autopilot till you either hit a snag (in which case back to the drawing board you go for more planning), or finish the task.
You can trust your subconscious to show you the right way and hope it's correct, or you can plan the right way and have more of a guarantee that it's correct.
Hopefully your boss is putting multiple things in front of you that can be juggled so that as you put something in the background something can take its place.
I've solved some of the most challenging problems I've ever faced in my professional life this way. By focusing on something else, usually another task in an entirely different project or section or even just looking at Youtube I'll often have an epiphany about something in a completely unrelated task. I'll go to prove my assumptions and sure enough, problem solved. Much more efficiently I might add.
When I only have one major thing to accomplish this looks like I'm doing nothing because on the surface I'm not. I'm often here on HN reading articles or on other websites filling my brain with useless trivia but it doesn't mean my mind isn't churning through the plates I have spinning. I'll also often pull a task out of background, make more assumptions, prove them incorrect, then put the task back in background mode until that efficient answer comes. This is not every task mind you, some things I can solve immediately. For the things I can't, this model absolutely does work for me 100% of the time.
Planning can be accomplished like any other task in exactly the same way. "I need to plan the Xyzzy presentation, am I ready to do this?" <consult gut feeling> "Yes, let's give it a go. What sorts of information am I going to need?" And go about your plan.
"Planning" can be just the thing your subconscious has decided a particular task needs. At this point it's no longer a task, but rather a project, and gets 'filed' differently in my mind. For each project, the first thing I do is decide what constitutes "done" for that project. I may be ready for the task of making that decision or my subconscious might decide I'm not ready for even that step yet.
From the conception of done I can then create a road map from here to done. Road maps have tasks, each task gets accomplished individually in the same subconscious-driven fashion. The road map isn't typically written down, it exists in my mind 'somewhere'.
A lot of times, subconscious 'nopes' alert me to the fact that there's something wrong with the road map or the approach.
One of the keys to making this work is to prioritize learning. Every nope contains a lesson, one of the reasons I let things go as long as they need to is so that I can give the subconscious space to bring these lessons to awareness. I consider the lessons to be more important than task completion in all but truly urgent and pressing issues.
Yup, that's why whenever I get stuck on the high-level design, I'll often start doing some of the small sub-tasks for which I'm highly-confident will be a part of the end-solution, and for which I'm highly confident that I know the interface they'll need, no matter what high-level approach is taken.
That extra domain work on the sub-tasks often feeds back to helping with the high-level planning too.
This, combined with abstract non-functional high-level prototypes will attack the problem from both the top and bottom. Hopefully you eventually complete the task when you meet somewhere in the middle.
"If you want something done ask a busy person."
Busy people always come through for you. I used to think this was because they were super efficient, super disciplined.
But maybe your task is a welcome distraction from something even worse?
And besides, everything we do is a distraction from the most looming, vaguest, most intractable deadline of all.
The End.
Of course, that is a poor way of thinking since all it does is make you lose your sense of purpose before you actually run out of tasks, but the human brain is weird like that sometimes.
I also used to think this when I was working in hourly task units like software development or consulting. Then when I started managing people I realized that being less busy while being efficient and organized was better. Flexibility is a great asset. I am not talking about working 4 hours but having room to think outside your daily or weekly issues.
If it works for you, go for it, but I do not work in 25 minute chunks.
> The important thing is that there should be a space of time, say four hours a day at least when a professional writer doesn’t do anything else but write. He doesn’t have to write, and if he doesn’t feel like it, he shouldn’t try. He can look out of the window, or stand on his head, or writhe on the floor. But he is not to do any other positive thing, not read, write letters, glance at magazines, or write checks. Write or nothing.
He commented somewhere that it works on the same principle as school - you can't force children to learn, but if you prevent them from doing anything else, the bright ones will learn just to stave off boredom.
1. Force yourself to sit here and do nothing else until the task is done. The Chandler method, which requires a great deal of discipline.
2. Keep telling yourself "I'll start just after I check Hacker News / Twitter / watch one more episode on Casualty". This means you never achieve anything and feel forever guilty and worthless.
3. Put the task to one side for now and do something else enjoyable and marginally useful. You make progress in other tasks, feel valuable, and only a little guilty.
Structured Procrastination is the third option. If you can't manage Option 1 -- and who can? -- it's better than Option 2.
That may not work for an author who's lacking inspiration, but in my case I found that when I sat down at the keyboard to work on my book, if I couldn't think of what to write I'd just start writing utter crap for a while until it started to flow a little better, then I was usually off to the races.
Also it's a task where inspiration is involved, so if he forced himself to write every day no matter what, some of it would be worthless because the ideas weren't there. The point of his approach is to make habits that ensure you accomplish something in the long run, regardless of whether you get something done today or not.
It can be effective.
The challenges for me:
1. Boxing sufficiently large chunks of time that I can actually work on a project. Task-switching has immense costs.
2. Actually having a path forward. If I've yet to find a good way to tackle a problem, or worse, if I'm stymied by having been mislead as to a possible pathway (a false Bayesian prior, or similar concepts in logic/truth), it can be quite frustrating.
All of this can be really quite educational. But in the end it's fairly impressive that it was ever done at all... which suggests that in fact it's not done; there are a ton of other plans for what should be here, and only because of those plans was the writer able to get this far.
[1] http://web.archive.org/web/20150214165654/http://www.structu...
Brilliant essays by John Perry, defending yet more life choices
generally seen as faults.It's true, some things you can put off, and nothing bad happens. Other things, you put off, you lose your job or your house. Ideally you can separate the two, but maybe not.
Sometimes you have to do things you don't want to do, or don't feel like doing. And that's life. Rarely do things get better by procrastinating about them, though more often they get worse.
Oftentimes I'll get out of bed with an unbearable drive to accomplish a single task that I've been putting off. And when this happens, I usually feel that I am more creative, dedicated, and much faster working. When you put that together, if you are trying to maximize work speed and creativity (ignoring deadlines), this kind of procrastination is optimal.
But ignoring deadlines to maximize speed and creativity is basically a way of maximizing personal fulfillment in the work. It certainly isn't maximizing any external factors.
That so very rarely ever actually happens, but that is the feeling I get when I stare at my TODO list. The solution is often to create a task just for analyzing the complexity of another task, to be able to break it up into sub tasks.
For example: "do taxes" might be broken into "find receipts", "print forms", "fill out form 1 worksheet", "complete form 1", "mail form 1", etc. The more detailed I can get it, the more space it takes in the TODO list, the more it blocks out other things, and the more it keeps the TODO list from stagnating--which is an important component of motivation for me.
I did this for years. #1 on my list was proving Fermat's Last Theorem. While I didn't do that, I got a thousand other things done.
Alas, someone else has proved Fermat's Last Theorem and now my task list looks like everyone else's.
:)
If you need help picking, I'm definitely going to go with P =? NP. That seems likely to keep you busy for a long time....
What I am is always laser-focused on a project, and not at all impressed by all the other things that the world is trying do demand of me.
I'm certainly not averse to hard work. I often choose it. (And somehow the reward is intrinsic.) I'm averse to any work that doesn't seem to directly factor into the success of whatever it is I'm presently obsessed with creating.
http://markforster.squarespace.com/blog/2015/5/21/the-final-...
In my experience, the side projects need to have one key trait, they need to be achievable in chunks of a few hours. I don't mind doing work multiple times in a week, but as soon as I'm expected to work on something 5+ hours in a single session I'll switch to do something else. Also, they need to be one off tasks, I don't like repeating myself.
Whilst this may annoy the non-procrastinators, it's just something I've worked out that works for me, though I never gave it a name before. I can still be very productive in short bursts.
To whomever wrote the article, thank you.
It appears that structured procrastination is a two-player game that pits the present self against the time-inconsistent hyperbolically discounted future self. The success of this strategy depends on accurately ranking more important things to do. Presumably the rank of the second-most important thing accurately reflects its hyperbolically discounted value far enough in the future to avoid time inconsistency. An assumption seems to be that most important or interesting thing to do now is generally important or interesting for the wrong reason. Also, if the thing I happen to be doing isn't that important, the thing I should be doing can't be that much more important either.
Now, I need to have my boss assign me to Hacker News reading duty, so that I can get my work done.
For me, it's mostly about knowing the things that I have to do, and just doing them whenever I feel like it. So long as I feel like it some time before the due date, it works out great! In the case where I never feel like it, then I force myself to start with sufficient time before the deadline and power through in one sitting. I find that so long as you know what I need to get done, and give myself enough lead time to stay ahead of my deadlines, it's a workable strategy.
For example I knew that I want to look for a new room. I couldn't start it because I did not know how much time it would take. This makes it really hard to start.
When I finally started I just said that I'll do it until 8 pm or something. This makes it easy to not stop cause "oh it's only 30 minutes I have to do this then I can go take a shower".
This is why I think techniques like pomodoro can really help someone. It's just hard to start something, and more you do it, more you know what's left. Usually this stops the fear for me.
For those who procrastinate at the gym enjoy the side effects of being fit and healthy. It's when it's work that we start experiencing sacrifice. There is only joy in procrastination. The author of this essay procrastinates by writing brilliants essays.
I did read somewhere that efficient workers sleep a lot and work a lot less. Those who have experience being their most efficient selves work towards that state of mind by sleeping and being lazy. And when they work, they get shit done. At the end of the day, it may very well be a tortoise vs hare race, where those that keep working slowly but surely catch the hares that only work sporadically. But for the same amount of work, the hare gets a life.
I'm pretty sure that deep-down I learned programming to distract myself from writing a novel I intended to write. Now I'm learning electronics to distract myself from programming. Imagine all that we could accomplish if we only procrastinated more!
[1] https://duckduckgo.com/?q=productive+procrastination+-procra...
Or the opposite. Because the subconscious figured out there is something more important to do than what you were doing.
Ignoring the pull of the subconscious is equal to self sabotage.
Overthinking about thinking can lead to neuroticism.
https://news.ycombinator.com/item?id=10142283
http://www.amazon.com/Do-Work-Overcome-Resistance-Your/dp/19...
I shipped 2 games + 1 update to Apple last month.
If it was that simple, everyone would just do that.
"Just x" usually indicates someone doesn't understand why others have problems with x.
It's not that simple; but it's also why not everyone is uber-successful.
In other words: here is a description of how it turns out I get (certain) things done; and not: here is a recipe for getting things done.
(It occurred to me to post it this morning because I spent half an hour making a 'retina'/hi-dpi version of the HN voting arrow and emailing it in, on the off-chance it might get used, in preference to about 14 more pressing tasks).